Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17194
Well Classification: GW Status: PA - 10/13/2021
Well Name/No:LOWER LATHAM #3-10G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61114
Facility Status:PAStatus Date10/13/2021
FacilityID:249391LocationID:336707
County:WELD #123Location:SESW 3 4N65W 6
Field:WATTENBERG - #90750Elevation:4671 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:568FSL  1945 FWLLat/Long: 40.335746 / -104.651667Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.336161 / -104.651712Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/13/2021             Measured TD: 7758 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/13/2021
Wellbore Permit
Permit #:930944 Expiration Date:11/13/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:10/15/1993
Measured TD:7758 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 469 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 469 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 469 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 275, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7743 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4528 ft., Bottom: 7743 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7743 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7743 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3862 ft., Bottom: 4260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3573 ft.
SUSSEX4064 ft.
NIOBRARA7227 ft.
FORT HAYS7568 ft.
CODELL7594 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/8/2009                  Interval Top: 7595 ft.    Interval Bottom: 7610 ft.

 Completed Information for Formation CODELL
1st Production Date:8/11/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/5/2006
Treatment Summary:TRI-FRAC'D W/ 128,478 GALS OF VISTAR W/ 28# GEL LOADINGS AND 243,900# 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7595 ft.# Of Holes:109
Interval Bottom:7610 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/13/2021                Interval Top: 7246 ft.    Interval Bottom: 7610 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/1993
Treatment Summary:COMMINGLE NBRR & CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7564 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 10
BTU_GAS 1287
CALC_BBLS_H2O 10
CALC_BBLS_OIL 10
CALC_GOR 16000
CALC_MCF_GAS 160
CASING_PRESS 600
GRAVITY_OIL 62
MCF_GAS 160
TUBING_PRESS 500
Perforation Data:
Interval Top:7246 ft.# Of Holes:243
Interval Bottom:7610 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/8/2009                  Interval Top: 7246 ft.    Interval Bottom: 7396 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2009
Treatment Summary:RE-FRACD NBRR W/ 177,229 GALS SLICKWATER, SILVERTIM & 15% HCI W/ 250,000# OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7246 ft.# Of Holes:128
Interval Bottom:7396 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/13/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No