|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/28/2018 Measured TD: 7810 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/28/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 012157 | Expiration Date: | 12/13/2002 | | Proposed Depth/Form: | 7765 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 526 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 526 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7308 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 4160 ft., Bottom: 7308 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/5/2002 | | Spud Date: | 2/4/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7810 ft. | Measured PB depth: | 7777 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CDCNGR, IGRS, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 526 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 10 ft., Bottom: 526 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7308 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 4160 ft., Bottom: 7308 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7254 ft., Depth: 7810 ft., Weight: 6.50 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7254 ft., Bottom: 7810 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6884 ft. | | N | N | | FORT HAYS | 7143 ft. | | N | N | | CODELL | 7165 ft. | | N | N | | J SAND | 7623 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/28/2018 Interval Top: 7647 ft. Interval Bottom: 7690 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/25/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/5/2002 | | Treatment Summary: | FRAC JSND W/102300# 20/40 MESH; 103824 GAL SAND LADEN FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7647 ft. | # Of Holes: | | | Interval Bottom: | 7690 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/25/2002 Interval Top: 6885 ft. Interval Bottom: 7690 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2002 | | Treatment Summary: | FRAC J SAND W/102300# 20/40 MESH; 103824 GAL SAND LADEN FLUID J SAND PERFS: 7647-7690 COMMINGLED WITH NB-CD |
| | Tubing Size: | | Tubing Setting Depth: | 7604 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/25/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 76750 | | CALC_MCF_GAS | 307 | | CASING_PRESS | 425 | | GRAVITY_OIL | 60 | | MCF_GAS | 307 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 6885 ft. | # Of Holes: | | | Interval Bottom: | 7690 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/28/2018| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/13/1993 | Choke Size: | 1,064.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/28/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|