Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16689
Well Classification: GW Status: PA - 8/13/2024
Well Name/No:Wertz Federal #24-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61539
Facility Status:PAStatus Date8/13/2024
FacilityID:248887LocationID:336673
County:WELD #123Location:SESW 12 4N66W 6
Field:WATTENBERG - #90750Elevation:4707 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:472FSL  1883 FWLLat/Long: 40.320740 / -104.728250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.320730 / -104.728240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/13/2024             Measured TD: 7339 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/13/2024
Wellbore Permit
Permit #:931506 Expiration Date:2/11/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2SW

Wellbore Completed
Completion Date:12/30/1993
Spud Date:12/18/1993Spud Date Is:ACTUAL
Measured TD:7339 ft.Measured PB depth:7290 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 360 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 360 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7325 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 6056 ft., Bottom: 7325 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7325 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 165, Top: 3830 ft., Bottom: 4770 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4373 ft.
NIOBRARA6867 ft.
CODELL7193 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/19/2022                 Interval Top: 7195 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation CODELL
1st Production Date:1/11/1994Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/1993
Treatment Summary:CODL 120750 GAL FLUID FRAC INFO REPRESENTS; CODL 261500 LBS 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7195 ft.# Of Holes:48
Interval Bottom:7204 ft.Hole Size:0.31 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/13/2024                 Interval Top: 6893 ft.    Interval Bottom: 7204 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/11/1994Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/1993
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 74800
CALC_MCF_GAS 374
CASING_PRESS 494
GRAVITY_OIL 62
MCF_GAS 374
TUBING_PRESS 367
Perforation Data:
Interval Top:6893 ft.# Of Holes:57
Interval Bottom:7204 ft.Hole Size:0.31 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/21/2022                 Interval Top: 6893 ft.    Interval Bottom: 7011 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/11/1994Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6893 ft.# Of Holes:12
Interval Bottom:7011 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No