Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16573
Well Classification: GW Status: PA - 11/29/2023
Well Name/No:ARISTOCRAT ANGUS #32-4C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/29/2023
FacilityID:248771LocationID:336635
County:WELD #123Location:SWNE 4 3N65W 6
Field:ARISTOCRAT - #2925Elevation:4822 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2071FNL  2112 FELLat/Long: 40.255997 / -104.666327Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.255791 / -104.666417Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/29/2023             Measured TD: 7310 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/29/2023
Wellbore PermitDRIFTED
Permit #:19921815 Expiration Date:3/30/1993
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE

Wellbore Completed
Completion Date:4/29/1993
Spud Date:12/10/1992Spud Date Is:ACTUAL
Measured TD:7310 ft.Measured PB depth:7216 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/FDC/CBL-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 603 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 603 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7295 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 428, Top: 4082 ft., Bottom: 7295 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4429 ft.NN
NIOBRARA6885 ft.NN
FORT HAYS7144 ft.NN
CODELL7167 ft.NN
GREENHORN7230 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/12/2023                Interval Top: 7168 ft.    Interval Bottom: 7182 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2023Treatment End Date:N/A
Treatment Summary:4/16/1993 perf 7170, 7172, 7174, 7176, 7178 5 holes; 5/22/2001 perf 7168 - 7182 28 holes
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7168 ft.# Of Holes:33
Interval Bottom:7182 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/29/2023                Interval Top: 6910 ft.    Interval Bottom: 7182 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/1993
Treatment Summary:NBRR-CDL COMMINGLE. RELEASED RBP @ 7150' TO COMMINGLE THE NBRR-CODL. 6/21/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 5
BTU_GAS 1339
CALC_BBLS_H2O 21
CALC_BBLS_OIL 5
CALC_GOR 26000
CALC_MCF_GAS 130
CASING_PRESS 560
GRAVITY_OIL 57
MCF_GAS 130
TUBING_PRESS 225
Perforation Data:
Interval Top:6910 ft.# Of Holes:468
Interval Bottom:7182 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/9/2023                  Interval Top: 6910 ft.    Interval Bottom: 7090 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2023Treatment End Date:N/A
Treatment Summary:4/16/1993 perf 6958, 6960, 6962 3 holes; 1/5/2004 perf 6910 - 6940, 7060 - 7090 120 holes, 5/21/2009 perf 6910 - 7090 312 holes
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/21/2009
Treatment Summary:NBRR RECOMPLETION. SET RBP @ 7150'. 5/20/09. FRAC'D THE NBRR W/185,010 GAL 28# - 16# VISTAR CROSS LINKED GEL HYBRID CONTAINING 350,580# 30/50 SAND. 5/21/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 10
BTU_GAS 1339
CALC_BBLS_H2O 23
CALC_BBLS_OIL 10
CALC_GOR 23200
CALC_MCF_GAS 232
CASING_PRESS 430
GRAVITY_OIL 60
MCF_GAS 232
Perforation Data:
Interval Top:6910 ft.# Of Holes:435
Interval Bottom:7090 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/29/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No