|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/12/2009 Measured TD: 7312 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/12/2009 | | Wellbore Permit | | | Permit #: | 19921525 | Expiration Date: | 9/15/1994 | | Proposed Depth/Form: | 7310 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
| Wellbore Completed | | Completion Date: | 5/18/1994 | | Spud Date: | 12/15/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7312 ft. | Measured PB depth: | 7254 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/FDC/CBL-GR CD-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 635 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 635 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7310 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 4410 ft., Bottom: 7310 ft., Determination Method: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 152, Top: 6482 ft., Bottom: , Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 285 ft. | 400 ft. | N | N | | SUSSEX | 4392 ft. | 4517 ft. | N | N | | NIOBRARA | 6914 ft. | 7130 ft. | N | N | | FORT HAYS | 7168 ft. | 7192 ft. | N | N | | CODELL | 7192 ft. | 7210 ft. | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 10/12/2009 Interval Top: 6930 ft. Interval Bottom: 7202 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/1/1993 | Choke Size: | 0.125 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/18/1994 | | Treatment Summary: | SEE SCANNED DOCS 00618242; 01108679; & 01265110 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7189 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_MCF_GAS | 12 | | CASING_PRESS | 260 | | MCF_GAS | 12 | | TUBING_PRESS | 55 |
| | Perforation Data: | | Interval Top: | 6930 ft. | # Of Holes: | 128 | | Interval Bottom: | 7202 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 10/12/2009 Interval Top: 4498 ft. Interval Bottom: 4508 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/12/2009 | | Treatment Summary: | SET CIBP@5355', POOH, LD SETTING TOOL. MU DUMP BAILER & RIH DUMP 2 SX CI G CMT ON TOP OF CIBP. POOH, LD DUMP BAILER, RD WIRELINE RIH WITH 5200' TBG-CIRC HOLE WITH 9.0 PPG MUD. POOH, STAND BACK 138 JTS TBG. RU HALLIBURTON WL. RIH WITH 10K CIBP. SET CIBP@4314'-(COLLAR@4304'). RIH WITH 4300' TBG. RU HALLIBURTON CEMENTING PUMP 10 BBL WATER, 4 BBL (20SX) CI G CMT & DISP WITH 15 BBI MUD POOH, LD 20 JTS TBG. CLOSE PIPE RAMS. PRESSURE TEST CSG TO 620 PSI WITH HALLIBURTON PUMP TRUCK-OK FINISH POOH.
RU HALLIBURTON WIRELINE. RIH WITH PERF GUN-SHOOT 4 SQUEEZE HOLES @ 685', POOH, LD GUN, RD HALLIBURTON WIRELINE. 10-09-09
PUMP 70 BBL WATER DOWN 4 1/2" CSG & UP 4 1/2"X 8 5/8" ANNULUS. TOOK 9 BBL TO FILL ANNULUS- GOOD RETURNS. MIX & PUMP 60 BBL (294 SX)
15.8 PPG CMT W/2% CAL. CEMENT STANDING AT SURFACE INSIDE 4 1/2" CSG PUMPED @ 4 TO 5 BPM- MAX PRESSURE 885 PSI
RD LEED RIG 722 & RD HALLIBURTON CEMENTERS.
DIG DOWN AROUND WH, CUT 8 5/8"& 4 1/2" CSG'S OFF 5' BELOW GL, WELD ON PLATE. BACK FILL HOLE. WELL P&A 10-12-09 | | Formation Treatment | | Treatment Date: | 5/18/1994 | | Treatment Summary: | FRAC'D W/ 289,000# 20/40 SAND IN 58,000 GALS X-LINKED PUR-GEL FLUID. PULL RBP. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 15714 | | CASING_PRESS | 500 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 4498 ft. | # Of Holes: | 20 | | Interval Bottom: | 4508 ft. | Hole Size: | 3.125 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/12/2009 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|