Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16147
Well Classification: GW Status: PA - 12/12/2022
Well Name/No:SCHMIDT #25-1F
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:66791
Facility Status:PAStatus Date12/12/2022
FacilityID:248349LocationID:328566
County:WELD #123Location:NENE 25 4N66W 6
Field:WATTENBERG - #90750Elevation:4768 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:872FNL  558 FELLat/Long: 40.288206 / -104.717459Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.288314 / -104.717534Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/12/2022             Measured TD: 7344 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/12/2022
Wellbore PermitDRIFTED
Permit #:921110 Expiration Date:1/3/1993
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:10/22/1992
Measured TD:7344 ft.Measured PB depth:7264 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 521 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 521 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7310 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 6526 ft., Bottom: 7310 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7310 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3761 ft., Bottom: 4800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3717 ft.
SUSSEX4163 ft.
NIOBRARA6900 ft.
FORT HAYS7202 ft.
CODELL7224 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/15/2022                 Interval Top: 7225 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation CODELL
1st Production Date:11/2/1992Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2010
Treatment Summary:CODELL SI UNDER SAND PLUG AT 7266.REMOVE SP AND COMMINGLE W/NB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7225 ft.# Of Holes:81
Interval Bottom:7240 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/12/2022                Interval Top: 6920 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/2/1992Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/22/2010
Treatment Summary:COMMINGLE CODELL AND NIOBRARA
Formation Treatment
Treatment Date:10/22/1992
Treatment Summary:COMMINGLE CODELL AND NIOBRARA.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 9
BTU_GAS 1238
CALC_BBLS_H2O 11
CALC_BBLS_OIL 9
CALC_GOR 26666
CALC_MCF_GAS 240
CASING_PRESS 400
GRAVITY_OIL 68
MCF_GAS 240
TUBING_PRESS 400
Perforation Data:
Interval Top:6920 ft.# Of Holes:173
Interval Bottom:7240 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/15/2022                 Interval Top: 6920 ft.    Interval Bottom: 7107 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/2/1992Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/1/2010
Treatment Summary:RE-FRAC'D NIOBRARA W/ 171,996 GALS OF SLICK WATER, VISTAR, AND 15% HCL WITH 249,000#'S OF OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 17
BTU_GAS 1238
CALC_BBLS_H2O 2
CALC_BBLS_OIL 17
CALC_GOR 18000
CALC_MCF_GAS 306
CASING_PRESS 1000
GRAVITY_OIL 67
MCF_GAS 306
TUBING_PRESS 0
Perforation Data:
Interval Top:6920 ft.# Of Holes:92
Interval Bottom:7107 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/12/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No