Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15756
Well Classification: GW Status: PR - 5/1/2025
Well Name/No:HSR-FINE #3-20A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:247958LocationID:328249
County:WELD #123Location:NENW 20 3N66W 6
Field:WATTENBERG - #90750Elevation:4897 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:805FNL  2116 FWLLat/Long: 40.215346 / -104.803041Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.215280 / -104.803180Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 7990 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore Permit
Permit #:20010196 Expiration Date:1/30/2002
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW

Wellbore Completed
Completion Date:6/25/2001
Spud Date:5/30/1992Spud Date Is:ACTUAL
Measured TD:7990 ft.Measured PB depth:7958 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:CDCNGR, IGRS, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 471 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 471 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7524 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6314 ft., Bottom: 7524 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7442 ft., Depth: 7990 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7442 ft., Bottom: 7990 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7094 ft.NN
FORT HAYS7352 ft.NN
CODELL7374 ft.NN
J SAND7820 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 3/1/2024                  Interval Top: 7822 ft.    Interval Bottom: 7880 ft.

 Completed Information for Formation J SAND
1st Production Date:6/28/2001Choke Size:0.219 in.
Formation Name:J SANDCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:6/25/2001
Treatment Summary:FRAC'D J SAND W/ 477400# 20/40 MESH; 221190 GAL. GELLED FLUID
Tubing Size:2.875 in.Tubing Setting Depth:7442 ft.
Tubing Packer Depth:7442 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/2001Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 8
CALC_BBLS_OIL 8
CALC_GOR 81125
CALC_MCF_GAS 649
GRAVITY_OIL 60
MCF_GAS 649
TUBING_PRESS 700
Perforation Data:
Interval Top:7822 ft.# Of Holes:86
Interval Bottom:7880 ft.Hole Size:0.23 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/6/2001                  Interval Top: 7095 ft.    Interval Bottom: 7880 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/30/2001Choke Size:0.219 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:6/25/2001
Treatment Summary:COMMINGLED J SAND WITH NB-CD
Tubing Size:2.375 in.Tubing Setting Depth:7800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2001Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_OIL 2
CALC_GOR 201500
CALC_MCF_GAS 403
CASING_PRESS 600
GRAVITY_OIL 60
MCF_GAS 403
TUBING_PRESS 425
Perforation Data:
Interval Top:7095 ft.# Of Holes:
Interval Bottom:7880 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 7095 ft.    Interval Bottom: 7390 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/14/1992Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:6/25/2001
Treatment Summary:7374-7390' FRAC'D W/350,000# 20/40 MESH SAND + 76,003 GAL GELLED FLUID. 7094-7253' FRAC'D W/228,000# 20/40 MESH SAND + 70,422 GAL GELLED FLUID,1992./ SHUT IN 7/2001 FOR J DEEPENING./ COMMINGLED W/JSAND & PRODUCING 9/6/2001.
Tubing Size:2.375 in.Tubing Setting Depth:7348 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/1992Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
CALC_BBLS_H2O 0
CALC_BBLS_OIL 20
CALC_GOR 8400
CALC_MCF_GAS 168
CASING_PRESS 700
GRAVITY_OIL 60
MCF_GAS 168
TUBING_PRESS 450
Perforation Data:
Interval Top:7095 ft.# Of Holes:43
Interval Bottom:7390 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)593
GOR
GOR DeterminationMCFE
Average BOE per Day0.275
Average MCFE per Day1.615

 Federal Financial Assurance  i 

 Tribal Well  i No