|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/19/2023 Measured TD: 7980 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/19/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20010192 | Expiration Date: | 1/30/2002 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SW |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/24/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7980 ft. | Measured PB depth: | 7947 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | SAAILC, SACNLD, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 531 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 531 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7493 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 6570 ft., Bottom: 7493 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4710 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 3978 ft., Bottom: 4710 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1303 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 431 ft., Bottom: 1303 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7431 ft., Depth: 7979 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: 7431 ft., Bottom: 7979 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7066 ft. | | N | N | | FORT HAYS | 7333 ft. | | N | N | | CODELL | 7353 ft. | | N | N | | J SAND | 7800 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/19/2023 Interval Top: 7833 ft. Interval Bottom: 7880 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/20/2001 | | Treatment Summary: | FRAC'D W/560,860# 20/40 MESH; 239,759 GAL GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7833 ft. | # Of Holes: | | | Interval Bottom: | 7880 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/2/2001 Interval Top: 7068 ft. Interval Bottom: 7880 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/29/2001 | Choke Size: | 0.219 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/20/2001 | | Treatment Summary: | J SAND COMMINGLED WITH NB-CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7784 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/2/2001 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 53875 | | CALC_MCF_GAS | 431 | | CASING_PRESS | 725 | | GRAVITY_OIL | 60 | | MCF_GAS | 431 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7068 ft. | # Of Holes: | | | Interval Bottom: | 7880 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/19/2023 Interval Top: 7068 ft. Interval Bottom: 7372 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/14/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/20/2001 | | Treatment Summary: | 7358-7372' FRAC'D W/264,000# 20/40 MESH SAND + 71,492 GAL GELLED FLUID. 7068-7240' FRAC'D W/228,000# 20/40 MESH SAND + 68,554 GAL GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7325 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/21/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 9267 | | CALC_MCF_GAS | 278 | | CASING_PRESS | 1750 | | GRAVITY_OIL | 60 | | MCF_GAS | 278 | | TUBING_PRESS | 1550 |
| | Perforation Data: | | Interval Top: | 7068 ft. | # Of Holes: | 42 | | Interval Bottom: | 7372 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/19/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|