|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/23/2025 Measured TD: 7919 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/23/2025 | | Wellbore Permit | | | Permit #: | 20011695 | Expiration Date: | 9/12/2002 | | Proposed Depth/Form: | 7910 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 1/18/2002 | | Spud Date: | 3/2/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7919 ft. | Measured PB depth: | 7887 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | CDCNGR,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 391 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 391 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7449 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 6500 ft., Bottom: 7449 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7373 ft., Depth: 7915 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7373 ft., Bottom: 7915 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7020 ft. | | N | N | | FORT HAYS | 7290 ft. | | N | N | | CODELL | 7311 ft. | | N | N | | J SAND | 7760 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/23/2025 Interval Top: 7778 ft. Interval Bottom: 7831 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/23/2002 | Choke Size: | 0.219 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2002 | | Treatment Summary: | FRAC'D J SAND W/555640# 20/40 MESH; 240,660 GALLONS GELLED FLUID. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7373 ft. | | Tubing Packer Depth: | 7373 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/23/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 90000 | | CALC_MCF_GAS | 450 | | CASING_PRESS | 410 | | GRAVITY_OIL | 58 | | MCF_GAS | 450 |
| | Perforation Data: | | Interval Top: | 7778 ft. | # Of Holes: | 106 | | Interval Bottom: | 7831 ft. | Hole Size: | 0.21 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/24/2002 Interval Top: 7022 ft. Interval Bottom: 7831 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/19/2002 | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2002 | | Treatment Summary: | COMMINGLED JNBCD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/24/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 59200 | | CALC_MCF_GAS | 296 | | CASING_PRESS | 500 | | GRAVITY_OIL | 58 | | MCF_GAS | 296 | | TUBING_PRESS | 375 |
| | Perforation Data: | | Interval Top: | 7022 ft. | # Of Holes: | | | Interval Bottom: | 7831 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/23/2025 Interval Top: 7022 ft. Interval Bottom: 7326 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/1/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2002 | | Treatment Summary: | 7312-7326' FRAC'D W/350,000# 20/40 MESH SAND + 74,452 GAL GELLED FLUID. 7022-7195' FRAC'D W/228,000# 20/40 MESH SAND + 67,473 GAL GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7281 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 26 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 13629 | | CALC_MCF_GAS | 345 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 60 | | MCF_GAS | 345 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 7022 ft. | # Of Holes: | 44 | | Interval Bottom: | 7326 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/23/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 256 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.071 |
| Average MCFE per Day | 0.405 |
| Federal Financial Assurance | i | |
|
|