Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15461
Well Classification: GW Status: PA - 1/10/2019
Well Name/No:DINNEL #14-7K
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/10/2019
FacilityID:247664LocationID:328037
County:WELD #123Location:SWNE 14 3N66W 6
Field:WATTENBERG - #90750Elevation:4944 ft.
Planned Location:1979FNL  1992 FELLat/Long: 40.226806 / -104.742079Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.226520 / -104.741260Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/8/2019             Measured TD: 8040 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/8/2019
Wellbore Permit
Permit #:20040025 Expiration Date:1/25/2005
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE

Wellbore Completed
Completion Date:3/25/2004
Spud Date:2/12/1992Spud Date Is:ACTUAL
Measured TD:8040 ft.Measured PB depth:8031 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, FDC, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 607 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7529 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6210 ft., Bottom: 7529 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5256 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4185 ft., Bottom: 5256 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7370 ft., Depth: 8037 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 11, Top: 7380 ft., Bottom: 8037 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7100 ft.NN
FORT HAYS7380 ft.NN
CODELL7403 ft.NN
J SAND7885 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/10/2019                 Interval Top: 7853 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J SAND
1st Production Date:4/15/2004Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/2004
Treatment Summary:FRAC'D J SAND W/144,312 GAL SILVERSTIM 24# GEL & 447,640# 20/40 SAND, 3/17/2004.// NOW SHUT IN (7/20/06) J SAND WILL BE COMMINGLED AT A LATER DATE. NO TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7853 ft.# Of Holes:68
Interval Bottom:7890 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/9/2006                  Interval Top: 7403 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation CODELL
1st Production Date:3/22/1992Choke Size: 
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/16/2006
Treatment Summary:7403-7418' ACIDIZE W/500 GAL 7.5% HCI; FRAC W/66,028 GAL 2% KCI WTR W/40# GUAR; W/10,000# 100 MESH SAND & 469,000# 20/40 MESH SAND, 1992. // CODL ABANDONED 3/4/2004 BEHIND LINER. // RE-FRAC CODL W/126,462 GALS OF VISTAR W/25/26/27# GEL LOADINGS & 246,660# 20/40 OTTAWA SAND, 2006..
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7403 ft.# Of Holes:48
Interval Bottom:7418 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 7/20/2006                 Interval Top: 7116 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/24/2005Choke Size:0.500 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/2004
Treatment Summary:COMMINGLE CODELL, J SAND & NIOBRARA, 1/31/05 // J SND IS SHUT IN PER 5A DTD 7/20/06.
Tubing Size:2.375 in.Tubing Setting Depth:7350 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
BTU_GAS 1115
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 49000
CALC_MCF_GAS 49
CASING_PRESS 360
GRAVITY_OIL 56.4
MCF_GAS 49
TUBING_PRESS 240
Perforation Data:
Interval Top:7116 ft.# Of Holes:144
Interval Bottom:7890 ft.Hole Size:

Formation JNBRR                   Formation Classification:  GW                   Status:  CM - 7/20/2006                 Interval Top: 7116 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J-NIOBRARA
1st Production Date:4/15/2004Choke Size:0.375 in.
Formation Name:J-NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/2004
Treatment Summary:COMMINGLE J SAND & NBRR.
Tubing Size:2.375 in.Tubing Setting Depth:7344 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 21
BTU_GAS 1133
CALC_BBLS_H2O 4
CALC_BBLS_OIL 21
CALC_GOR 16905
CALC_MCF_GAS 355
CASING_PRESS 640
GRAVITY_OIL 63.4
MCF_GAS 335
TUBING_PRESS 400
Perforation Data:
Interval Top:7116 ft.# Of Holes:96
Interval Bottom:7890 ft.Hole Size:0.23 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/10/2019                 Interval Top: 7116 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/22/1992Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/2004
Treatment Summary:COMMINGLE CODELL AND NIOBRARA.
Tubing Size:2.375 in.Tubing Setting Depth:7371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2006Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 7
BTU_GAS 1.2123
CALC_GOR 29285
CASING_PRESS 280
MCF_GAS 205
TUBING_PRESS 140
Perforation Data:
Interval Top:7116 ft.# Of Holes:76
Interval Bottom:7418 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/9/2006                  Interval Top: 7116 ft.    Interval Bottom: 7264 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/22/1992Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/2004
Treatment Summary:7116-7264' ACIDIZE W/1000 GAL 7.5% HCI; FRAC W/70,980 GAL 2% KCI WTR W/40# GUAR W/10,000# 100 MESH SND & 130,000# 20/40 MESH SAND. NO TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7116 ft.# Of Holes:28
Interval Bottom:7264 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/10/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No