|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/8/2024 Measured TD: 8250 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/8/2024 | | Wellbore Permit | | | Permit #: | 911147 | Expiration Date: | 6/12/1996 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 12/7/1991 | | Spud Date: | 11/26/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8250 ft. | Measured PB depth: | 8190 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 343 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 343 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8236 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 6810 ft., Bottom: 8236 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: 6710 ft., Depth: 6640 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 6367 ft., Bottom: 6640 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 350 ft. | | | | | SUSSEX | 4330 ft. | | | | | SHANNON | 4785 ft. | | | | | NIOBRARA | 7035 ft. | | | | | FORT HAYS | 7306 ft. | | | | | CODELL | 7326 ft. | | | | | J SAND | 7769 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/8/2024 Interval Top: 7769 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/3/1992 | Choke Size: | 1,664.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | No Perforation Data was found for formation JSND. |
|
Formation CODL Formation Classification: GW Status: AB - 8/8/2024 Interval Top: 7330 ft. Interval Bottom: 7344 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/29/2009 | | Treatment Summary: | CDL RE-FRAC AND RECOMPLETION. SET CBP @ 7410'. 1/18/09. RE-FRAC'D THE CODELL WITH 100842 GAL 24 VISTAR HYBRID CROSS LINKED GEL CONTAINING 252220 SAND. 1/29/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 56 | | Interval Bottom: | 7344 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/10/2009 Interval Top: 7330 ft. Interval Bottom: 7836 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/20/1992 | | Treatment Summary: | JSND-CDL COMMINGLE. DRILLED OUT CBP @ 7410' TO COMMINGLE THE JSND-CDL. 2/4/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7751 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 15 | | BTU_GAS | 1282 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 13133 | | CALC_MCF_GAS | 197 | | CASING_PRESS | 497 | | GRAVITY_OIL | 54 | | MCF_GAS | 197 | | TUBING_PRESS | 481 |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 172 | | Interval Bottom: | 7836 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/08/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|