|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/2/2025 Measured TD: 8181 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/2/2025 | | Wellbore Permit | | | Permit #: | 19910936 | Expiration Date: | 10/1/1992 | | Proposed Depth/Form: | 8181 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 5/25/1996 | | Spud Date: | 11/1/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8181 ft. | Measured PB depth: | 8077 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SFL/GR, CNL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 417 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 417 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8209 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 6936 ft., Bottom: 8209 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5086 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 4210 ft., Bottom: 5086 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4516 ft. | | N | N | | SHANNON | 4940 ft. | | N | N | | NIOBRARA | 7312 ft. | | N | N | | FORT HAYS | 7570 ft. | | N | N | | CODELL | 7592 ft. | | N | N | | J SAND | 8013 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/2/2025 Interval Top: 8016 ft. Interval Bottom: 8057 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/10/1992 | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/25/1996 | | Treatment Summary: | 595,000# 20-40 SAND; 223,124 GALS X-LINKED FLUID |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8090 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/10/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 83333 | | CALC_MCF_GAS | 1250 | | CASING_PRESS | 1850 | | MCF_GAS | 1250 | | TUBING_PRESS | 1225 |
| | Perforation Data: | | Interval Top: | 8016 ft. | # Of Holes: | 82 | | Interval Bottom: | 8057 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 5/2/2025 Interval Top: 7594 ft. Interval Bottom: 7610 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/14/1996 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/25/1996 | | Treatment Summary: | 111,800 GALS SATURN III; 10,000# 100 MESH; 392,000# 20-40 SAND; 8,000# 12-20 RESIN-COATED SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7558 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 6037 | | CALC_MCF_GAS | 163 | | CASING_PRESS | 316 | | MCF_GAS | 163 | | TUBING_PRESS | 170 |
| | Perforation Data: | | Interval Top: | 7594 ft. | # Of Holes: | 56 | | Interval Bottom: | 7610 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/25/1996 Interval Top: 7594 ft. Interval Bottom: 8057 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 5/25/1996 | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.35 in. | Tubing Setting Depth: | 7590 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/23/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 17.2 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 17.2 | | CALC_GOR | 21919 | | CALC_MCF_GAS | 378 | | CASING_PRESS | 292 | | MCF_GAS | 378 | | TUBING_PRESS | 125 |
| | Perforation Data: | | Interval Top: | 7594 ft. | # Of Holes: | 138 | | Interval Bottom: | 8057 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/02/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 56 |
| Total Gas Produced (MCF) | 1986 |
| GOR | 35464 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.134 |
| Average MCFE per Day | 6.566 |
| Federal Financial Assurance | i | |
|
|