Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15161
Well Classification: OW Status: TA - 3/14/2017
Well Name/No:FRANK #H21-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/14/2017
FacilityID:247364LocationID:327796
County:WELD #123Location:SWSE 21 3N65W 6
Field:WATTENBERG - #90750Elevation:4825 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FELLat/Long: 40.205437 / -104.666457Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.204424 / -104.666864Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 3/14/2017             Measured TD: 7391 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 3/14/2017
Wellbore Permit
Permit #:19910705 Expiration Date:12/18/1991
Proposed Depth/Form:7400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE

Wellbore Completed
Completion Date:9/3/1991
Spud Date:8/28/1991Spud Date Is:ACTUAL
Measured TD:7391 ft.Measured PB depth:7358 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/GR, FDC/GR, CBL
Log Types:GR/SONIC/COLLAR LOG, DIL/SFL-GR, CFD-GR,MICROLOG.
Log Types:Gamma Ray CCL/CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 493 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 493 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7386 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 6444 ft., Bottom: 7386 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4930 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 4015 ft., Bottom: 4930 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 678 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 265 ft., Bottom: 678 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4404 ft.NN
NIOBRARA6909 ft.NN
CODELL7230 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/23/2011                Interval Top: 7232 ft.    Interval Bottom: 7242 ft.

 Completed Information for Formation CODELL
1st Production Date:10/18/1991Choke Size:0.250 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:10/17/1991
Treatment Summary:131,000# 20/40 SND;59,682 GALS WTR, 1991.//(REFRAC)135,702 GALS VISTAR 24/22 FLUID & 246,300# 20/40 SAND,8/30/2001. //(TRIFRAC)133,182 GAL VISTAR 28/26# GEL & 245,900# 20/40 OTTAWA SAND, 5/14/03
Tubing Size:2.0625 in.Tubing Setting Depth:7210 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/1991Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 48
CALC_BBLS_H2O 16
CALC_BBLS_OIL 48
CALC_GOR 6667
CALC_MCF_GAS 320
MCF_GAS 320
TUBING_PRESS 1200
Perforation Data:
Interval Top:7232 ft.# Of Holes:60
Interval Bottom:7242 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 3/14/2017                 Interval Top: 6937 ft.    Interval Bottom: 7244 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/18/1991Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/17/1991
Treatment Summary:COMMINGLED.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 7
BTU_GAS 1308
CALC_BBLS_H2O 8
CALC_BBLS_OIL 14
CALC_GOR 19000
CALC_MCF_GAS 266
CASING_PRESS 650
GRAVITY_OIL 60.7
MCF_GAS 133
TUBING_PRESS 420
Perforation Data:
Interval Top:6937 ft.# Of Holes:132
Interval Bottom:7244 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/10/2003                 Interval Top: 6937 ft.    Interval Bottom: 6999 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/23/1996Choke Size:0.312 in.
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:10/17/1991
Treatment Summary:144,631# 20/40 SAND, 1008 GALS 7.5% HCL, 45,192 GALS WTR W/CLAYTREAT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/1996Test Method:FLOWING
Hours Tested:4Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 6
CALC_BBLS_H2O 18
CALC_BBLS_OIL 24
CALC_GOR 13750
CALC_MCF_GAS 330
CASING_PRESS 900
MCF_GAS 55
Perforation Data:
Interval Top:6937 ft.# Of Holes:20
Interval Bottom:6999 ft.Hole Size:0.34 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
02/28/2015
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No