|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/24/2015 Measured TD: 8677 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/24/2015 | Wellbore Permit | | Permit #: | 19910426 | Expiration Date: | 5/29/1992 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 232-47 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 |
| | |
Wellbore Completed | Completion Date: | 8/20/1993 | Spud Date: | 6/14/1991 | Spud Date Is: | ACTUAL | Measured TD: | 8677 ft. | Measured PB depth: | 8630 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIL, LDT, CNL, GR, CALIPER | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 781 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 781 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8677 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 1010, Top: 3720 ft., Bottom: 8677 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8677 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 3720 ft., Bottom: 6590 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4680 ft. | | | | SHANNON | 5220 ft. | | | | NIOBRARA | 7484 ft. | | | | CODELL | 7832 ft. | | | | MUDDY J | 8250 ft. | | | | J SAND | 8277 ft. | | | | DAKOTA | 8436 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 3/24/2015 Interval Top: 8436 ft. Interval Bottom: 8498 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 12/16/1991 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8290 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/3/1992 | Test Method: | FLOWING | Hours Tested: | 96 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 12 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 2 | CALC_MCF_GAS | 278 | CASING_PRESS | 125 | MCF_GAS | 111 | TUBING_PRESS | 990 |
| Perforation Data: | Interval Top: | 8436 ft. | # Of Holes: | 152 | Interval Bottom: | 8498 ft. | Hole Size: | 0.5 in. |
|
Formation JSND Formation Classification: GW Status: AB - 3/24/2015 Interval Top: 8275 ft. Interval Bottom: 8303 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/15/1993 | Choke Size: | 0.218 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/29/1993 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 17 | CASING_PRESS | 650 | MCF_GAS | 537 | TUBING_PRESS | 450 |
| Perforation Data: | Interval Top: | 8275 ft. | # Of Holes: | 168 | Interval Bottom: | 8303 ft. | Hole Size: | 0.5 in. |
|
Formation CODL Formation Classification: GW Status: AB - 3/24/2015 Interval Top: 7833 ft. Interval Bottom: 7853 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/20/1993 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/20/1993 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 43 | BBLS_OIL | 19 | CALC_GOR | 24000 | CASING_PRESS | 529 | MCF_GAS | 456 | TUBING_PRESS | 234 |
| Perforation Data: | Interval Top: | 7833 ft. | # Of Holes: | 80 | Interval Bottom: | 7853 ft. | Hole Size: | 0.5 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 3/24/2015 Completed Information for Formation DAKOTA-J-CODELL | 1st Production Date: | 6/15/1993 | Choke Size: | | Formation Name: | DAKOTA-J-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKJCD. |
| No Perforation Data was found for formation DKJCD. |
|
|
|
|
|
Reported Plugged | Y | 03/24/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|