|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/8/2022 Measured TD: 8016 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/8/2022 | | Wellbore Permit | | | Permit #: | 20020138 | Expiration Date: | 1/17/2003 | | Proposed Depth/Form: | 8005 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 5/1/2002 | | Spud Date: | 6/6/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8016 ft. | Measured PB depth: | 7961 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | CDCNGR, IGRS, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 644 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 644 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7545 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 6636 ft., Bottom: 7545 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 4200 ft., Bottom: 4950 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7488 ft., Depth: 7992 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7488 ft., Bottom: 7992 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7120 ft. | | N | N | | FORT HAYS | 7381 ft. | | N | N | | CODELL | 7403 ft. | | N | N | | J SAND | 7856 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/8/2022 Interval Top: 7877 ft. Interval Bottom: 7904 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/8/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/1/2002 | | Treatment Summary: | FRAC'D J SAND W/ 383,100# 20/40 MESH; 163,548 GALS. GELLED FLUID. COMMINGLED W/ NB-CD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7877 ft. | # Of Holes: | | | Interval Bottom: | 7904 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 7/18/2002 Interval Top: 7404 ft. Interval Bottom: 7420 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/2/1991 | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/1/2002 | | Treatment Summary: | FRC'D W/342,000# 20/40 MESH SAND + 75,337 GALS.GELLED FLUID |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7329 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/5/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 23 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 20174 | | CALC_MCF_GAS | 464 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 60 | | MCF_GAS | 464 | | TUBING_PRESS | 1250 |
| | Perforation Data: | | Interval Top: | 7404 ft. | # Of Holes: | 28 | | Interval Bottom: | 7420 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/18/2002 Interval Top: 7121 ft. Interval Bottom: 7904 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/8/2002 | Choke Size: | 0.250 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/1/2002 | | Treatment Summary: | COMMINGLED J SAND WITH NB-CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7835 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/15/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 49143 | | CALC_MCF_GAS | 344 | | CASING_PRESS | 440 | | GRAVITY_OIL | 60 | | MCF_GAS | 344 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7121 ft. | # Of Holes: | | | Interval Bottom: | 7904 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/8/2022 Interval Top: 7121 ft. Interval Bottom: 7420 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/30/1992 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/1/2002 | | Treatment Summary: | 7404-7420' FRAC'D W/ 342,000# 20/40 MESH SAND + 75,337 GALS GELLED FLUID. // 7121-7286' FRAC'D W/228,000# 20/40 MESH SAND + 68,500 GALS. GELLED FLUID. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7360 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 13 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 17077 | | CALC_MCF_GAS | 222 | | CASING_PRESS | 1200 | | GRAVITY_OIL | 60 | | MCF_GAS | 222 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7121 ft. | # Of Holes: | 48 | | Interval Bottom: | 7420 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/08/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|