|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/12/2024 Measured TD: 7319 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/12/2024 | | Wellbore Permit | | | Permit #: | 910064 | Expiration Date: | 10/18/1994 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2SE |
| | |
| Wellbore Completed | | Completion Date: | 3/26/1991 | | Measured TD: | 7319 ft. | Measured PB depth: | 7231 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 506 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 506 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7297 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 6716 ft., Bottom: 7297 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7297 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 4490 ft., Bottom: 5551 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4490 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 3318 ft., Bottom: 4490 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3701 ft. | | | | | SUSSEX | 4320 ft. | | | | | NIOBRARA | 6851 ft. | | | | | FORT HAYS | 7141 ft. | | | | | CODELL | 7164 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 3/29/1991 Interval Top: 7165 ft. Interval Bottom: 7180 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/26/1991 | | Treatment Summary: | 132,216 GAL VISTAR 28/26# GEL & 246,720# 20/40 OTTAWA SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7158 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/1/2002 | Test Method: | FLOWING | | Hours Tested: | 6 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 72 | | CALC_MCF_GAS | 580 | | CASING_PRESS | 500 | | MCF_GAS | 145 | | TUBING_PRESS | 390 |
| | Perforation Data: | | Interval Top: | 7165 ft. | # Of Holes: | 60 | | Interval Bottom: | 7180 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/12/2024 Interval Top: 6866 ft. Interval Bottom: 7180 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/26/1991 | | Treatment Summary: | COMMINGLE CODELL/NIOBRARA |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7136 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 12 | | BTU_GAS | 1252 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 19829 | | CALC_MCF_GAS | 232 | | CASING_PRESS | 275 | | GRAVITY_OIL | 58 | | MCF_GAS | 232 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 6866 ft. | # Of Holes: | 204 | | Interval Bottom: | 7180 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/20/2009 Interval Top: 6772 ft. Interval Bottom: 6980 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/8/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/8/2008 | | Treatment Summary: | RE-FRAC'D NIOBRARA W/172,284 GALS OF VISTAR, SLICK WATER AND 15% HCI WITH 250,500#'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6772 ft. | # Of Holes: | 144 | | Interval Bottom: | 6980 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/12/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|