|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/3/2018 Measured TD: 7515 ft. Vertical TD: 7515 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/3/2018 | | Wellbore Permit | | | Permit #: | 19900897 | Expiration Date: | 12/20/1990 | | Proposed Depth/Form: | 7515 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NW |
| | |
| Wellbore Completed | | Completion Date: | 9/27/1990 | | Spud Date: | 9/6/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 7515 ft. | Measured PB depth: | 7489 ft. | | True Vertical TD: | 7515 ft. | True Vertical PB depth: | 7489 ft. | | Log Types: | CBL, COMP.DENSITY, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 542 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 0 ft., Bottom: 542 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7512 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 6530 ft., Bottom: 7512 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4504 ft. | | N | N | | NIOBRARA | 7026 ft. | | N | N | | CODELL | 7336 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/19/2013 Interval Top: 7336 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/27/1990 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/27/2011 | | Treatment Summary: | Codell under sand plug @ 7160. | | Formation Treatment | | Treatment Date: | 9/27/1990 | | Treatment Summary: | FRAC'D W/60,220 GALS GELLED WATER + 180,000# 20/40 SAND, 1990. // (REFRAC) 133,056 GAL VISTAR 28/26# GEL & 245,840# 20/40 OTTAWA SAND,2002. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 11 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 20454 | | CALC_MCF_GAS | 675 | | CASING_PRESS | 700 | | MCF_GAS | 225 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 7336 ft. | # Of Holes: | 102 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.23 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/3/2018 Interval Top: 7052 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | Commingle Codell and Niobrara. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7029 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/17/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 194 | | BBLS_OIL | 8 | | BTU_GAS | 1243 | | CALC_BBLS_H2O | 194 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 1250 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 478 | | GRAVITY_OIL | 64 | | MCF_GAS | 10 | | TUBING_PRESS | 236 |
| | Perforation Data: | | Interval Top: | 7052 ft. | # Of Holes: | 230 | | Interval Bottom: | 7350 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/19/2013 Interval Top: 7052 ft. Interval Bottom: 7120 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/27/2011 | | Treatment Summary: | Frac'd the Niobrara w/ 149512 gals of Vistar and Slick Water 15% HCL with 263609#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 143 | | BTU_GAS | 1236 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 143 | | CALC_GOR | 601 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 1750 | | GRAVITY_OIL | 63 | | MCF_GAS | 86 |
| | Perforation Data: | | Interval Top: | 7052 ft. | # Of Holes: | 128 | | Interval Bottom: | 7120 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/03/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|