|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/13/2025 Measured TD: 8050 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/13/2025 | | Wellbore Permit | | | Permit #: | 20020467 | Expiration Date: | 3/5/2003 | | Proposed Depth/Form: | 8030 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 5/29/2002 | | Spud Date: | 8/9/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 8018 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | SACNLD, SAAILC, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 710 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 710 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7575 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 180, Top: 6410 ft., Bottom: 7575 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7529 ft., Depth: 8051 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 21, Top: 7529 ft., Bottom: 8051 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4642 ft. | | N | N | | NIOBRARA | 7144 ft. | | N | N | | FORT HAYS | 7403 ft. | | N | N | | CODELL | 7426 ft. | | N | N | | GREENHORN | 7508 ft. | | N | N | | J SAND | 7881 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/13/2025 Interval Top: 7882 ft. Interval Bottom: 7946 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/10/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/29/2002 | | Treatment Summary: | FRAC'D JSAND W/503,400# 20/40 MESH; 210,168 GALS GELLED FLUID. NO TEST. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7882 ft. | # Of Holes: | | | Interval Bottom: | 7946 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 7/13/2002 Interval Top: 7426 ft. Interval Bottom: 7442 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/9/1990 | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/29/2002 | | Treatment Summary: | 7426-7442' FRAC'D W/24,000# 100 MESH; 238,000# 20/40 MESH; 64,500 GAL GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 42 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 11238 | | CALC_MCF_GAS | 472 | | CASING_PRESS | 2300 | | GRAVITY_OIL | 60 | | MCF_GAS | 472 | | TUBING_PRESS | 2150 |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 17 | | Interval Bottom: | 7442 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/13/2002 Interval Top: 7144 ft. Interval Bottom: 7946 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/10/2002 | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/29/2002 | | Treatment Summary: | COMMINGLED J SAND WITH NB-CD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7871 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/13/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 11 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 15364 | | CALC_MCF_GAS | 169 | | CASING_PRESS | 570 | | GRAVITY_OIL | 60 | | MCF_GAS | 169 | | TUBING_PRESS | 160 |
| | Perforation Data: | | Interval Top: | 7144 ft. | # Of Holes: | | | Interval Bottom: | 7946 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/13/2025 Interval Top: 6820 ft. Interval Bottom: 7121 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/5/2010 | Choke Size: | 0.438 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2010 | | Treatment Summary: | NB PERF 6820 - 7018 HOLES 73 SIZE .38 CD PERF 7111-7121 HOLES 30 SIZE 0.38 RE-FRAC NB W/ 500 GAL 15% HCI & 168,390 GAL VISTAR HYBRID W/ 255,400# 20/40 & 4,080# 20/40 SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7086 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/16/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 11 | | BTU_GAS | 1266 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 6667 | | CALC_MCF_GAS | 60 | | CASING_PRESS | 1036 | | GRAVITY_OIL | 47 | | MCF_GAS | 60 | | TUBING_PRESS | 9937 |
| | Perforation Data: | | Interval Top: | 6820 ft. | # Of Holes: | 103 | | Interval Bottom: | 7121 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 12/29/2009 Interval Top: 4455 ft. Interval Bottom: 4482 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SUSX. |
| | Perforation Data: | | Interval Top: | 4455 ft. | # Of Holes: | 16 | | Interval Bottom: | 4482 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/13/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|