Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14626
Well Classification: GW Status: SI - 8/1/2020
Well Name/No:HSR-BARTH #6-27 A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2020
FacilityID:246829LocationID:327401
County:WELD #123Location:SENW 27 3N66W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  1980 FWLLat/Long: 40.197837 / -104.765760Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.197920 / -104.765830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2020             Measured TD: 7971 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2020
Wellbore Permit
Permit #:20011141 Expiration Date:6/12/2002
Proposed Depth/Form:8150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: S2NW
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 459/318A , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:7/17/2001
Spud Date:7/3/1990Spud Date Is:ACTUAL
Measured TD:7971 ft.Measured PB depth:7960 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:CDCNGR, IGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 613 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 613 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7505 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 6530 ft., Bottom: 7505 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7439 ft., Depth: 7970 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7439 ft., Bottom: 7970 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7124 ft.NN
FORT HAYS7334 ft.NN
CODELL7355 ft.NN
J SAND7810 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 8/1/2020                  Interval Top: 7812 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J SAND
1st Production Date:9/11/2001Choke Size: 
Formation Name:J SANDCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:7/17/2001
Treatment Summary:FRAC'D W/503,820# 20/40 MESH; 209,552 GAL GELLED FLUID. NO TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7812 ft.# Of Holes:
Interval Bottom:7866 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/11/2001                 Interval Top: 7356 ft.    Interval Bottom: 7374 ft.

 Completed Information for Formation CODELL
1st Production Date:10/26/1990Choke Size:0.156 in.
Formation Name:CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:7/17/2001
Treatment Summary:7356-7374' FRAC'D W/24,000# 100 MESH SAND; 360,000# 20/40 MESH SAND; 74,000 GALS GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7194 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/7/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 34
CALC_BBLS_H2O 0
CALC_BBLS_OIL 34
CALC_GOR 3735
CALC_MCF_GAS 127
CASING_PRESS 1250
GRAVITY_OIL 60
MCF_GAS 127
TUBING_PRESS 850
Perforation Data:
Interval Top:7356 ft.# Of Holes:19
Interval Bottom:7374 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/11/2001                 Interval Top: 7125 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/30/2001Choke Size:0.344 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:7/17/2001
Treatment Summary:COMMINGLED JSAND WITH NB-CD
Tubing Size:2.375 in.Tubing Setting Depth:7783 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/11/2001Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 84500
CALC_MCF_GAS 169
CASING_PRESS 600
GRAVITY_OIL 60
MCF_GAS 169
TUBING_PRESS 400
Perforation Data:
Interval Top:7125 ft.# Of Holes:
Interval Bottom:7866 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 8/1/2020                  Interval Top: 7125 ft.    Interval Bottom: 7374 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/19/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:7/17/2001
Treatment Summary:SEE CODL. NBRR:7125-7187' FRAC'D W/230,500# 20/40 MESH SAND + 64,553AL GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7324 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/1993Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 10
CALC_BBLS_H2O 0
CALC_BBLS_OIL 10
CALC_GOR 4400
CALC_MCF_GAS 44
CASING_PRESS 1400
GRAVITY_OIL 60
MCF_GAS 44
TUBING_PRESS 900
Perforation Data:
Interval Top:7125 ft.# Of Holes:37
Interval Bottom:7374 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
07/31/2020
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No