|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 7/15/2025 Measured TD: 8130 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 7/15/2025 | Wellbore Permit | | Permit #: | 19900386 | Expiration Date: | 4/17/1991 | Proposed Depth/Form: | 8165 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: A-1-3 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: S2 |
| | |
Wellbore Completed | Completion Date: | 1/20/2005 | Spud Date: | 5/8/1990 | Spud Date Is: | ACTUAL | Measured TD: | 8130 ft. | Measured PB depth: | 8128 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | Log Types: | DIL, CDL, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 625 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 625 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8128 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 6250 ft., Bottom: 8128 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4444 ft. | | N | N | NIOBRARA | 7262 ft. | | N | N | CODELL | 7544 ft. | | N | N | J SAND | 7978 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 7/15/2025 Interval Top: 7980 ft. Interval Bottom: 8014 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/25/1992 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/20/2005 | Treatment Summary: | 23,000# 100 MESH; 734,000# 20-40 SAND. AVG PIR 35 BPM @ 2050# |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 5 | CASING_PRESS | 1925 | MCF_GAS | 450 |
| Perforation Data: | Interval Top: | 7980 ft. | # Of Holes: | 41 | Interval Bottom: | 8014 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: TA - 7/15/2025 Interval Top: 7562 ft. Interval Bottom: 7333 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/4/1992 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/20/2005 | Treatment Summary: | ORIGINAL COMPLETION: 26,000# 100 MESH; 415,000# 20-40 SAND. 10/20/03 CODL REPERF 7545-7562' (68 HOLES) & REFRAC W/ 129,528 GALS VISTAR 28# GEL & 245,560# 20/40 SAND, |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 17 | BTU_GAS | 1288 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 17 | CALC_GOR | 5882 | CALC_MCF_GAS | 100 | CASING_PRESS | 600 | MCF_GAS | 100 | TUBING_PRESS | 540 |
| Perforation Data: | Interval Top: | 7562 ft. | # Of Holes: | 81 | Interval Bottom: | 7333 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7333 ft. Interval Bottom: 8014 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/29/1992 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 3 | BTU_GAS | 1236 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 3 | CALC_GOR | 30000 | CALC_MCF_GAS | 90 | CASING_PRESS | 525 | GRAVITY_OIL | 52.4 | MCF_GAS | 90 | TUBING_PRESS | 375 |
| Perforation Data: | Interval Top: | 7333 ft. | # Of Holes: | 122 | Interval Bottom: | 8014 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 05/22/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 8 |
Total Gas Produced (MCF) | 1067 |
GOR | 133375 |
GOR Determination | MCFE |
Average BOE per Day | 0.527 |
Average MCFE per Day | 3.056 |
Federal Financial Assurance | i | |
|
|