|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/13/2025 Measured TD: 8130 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/13/2025 | | Wellbore Permit | | | Permit #: | 19900386 | Expiration Date: | 4/17/1991 | | Proposed Depth/Form: | 8165 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: A-1-3 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 1/20/2005 | | Spud Date: | 5/8/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 8130 ft. | Measured PB depth: | 8128 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | DIL, CDL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 625 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 625 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8128 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 6250 ft., Bottom: 8128 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4444 ft. | | N | N | | NIOBRARA | 7262 ft. | | N | N | | CODELL | 7544 ft. | | N | N | | J SAND | 7978 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/13/2025 Interval Top: 7980 ft. Interval Bottom: 8014 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/25/1992 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/20/2005 | | Treatment Summary: | 23,000# 100 MESH; 734,000# 20-40 SAND. AVG PIR 35 BPM @ 2050# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CASING_PRESS | 1925 | | MCF_GAS | 450 |
| | Perforation Data: | | Interval Top: | 7980 ft. | # Of Holes: | 41 | | Interval Bottom: | 8014 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/13/2025 Interval Top: 7562 ft. Interval Bottom: 7333 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/4/1992 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/20/2005 | | Treatment Summary: | ORIGINAL COMPLETION: 26,000# 100 MESH; 415,000# 20-40 SAND. 10/20/03 CODL REPERF 7545-7562' (68 HOLES) & REFRAC W/ 129,528 GALS VISTAR 28# GEL & 245,560# 20/40 SAND, |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 17 | | BTU_GAS | 1288 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 5882 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 600 | | MCF_GAS | 100 | | TUBING_PRESS | 540 |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 81 | | Interval Bottom: | 7333 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7333 ft. Interval Bottom: 8014 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/29/1992 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 3 | | BTU_GAS | 1236 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 30000 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 525 | | GRAVITY_OIL | 52.4 | | MCF_GAS | 90 | | TUBING_PRESS | 375 |
| | Perforation Data: | | Interval Top: | 7333 ft. | # Of Holes: | 122 | | Interval Bottom: | 8014 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/13/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 05/22/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|