Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14596
Well Classification: GW Status: TA - 9/21/2023
Well Name/No:FEDERAL J #9-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-28091-ACQ
Facility Status:TAStatus Date9/21/2023
FacilityID:246799LocationID:327381
County:WELD #123Location:NESE 23 8N60W 6
Field:CLAY BASKET - #11340Elevation:4915 ft.
Planned Location:1980FSL  660 FELLat/Long: 40.646085 / -104.051311Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.646080 / -104.051200Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/5/2012
End Date: 5/5/2012
Reported: 8/24/2012
Days to report: 111
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 9/21/2023             Measured TD: 7000 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 9/21/2023
Wellbore Permit
Permit #:19900328 Expiration Date:8/9/1990
Prop Depth/Form:7000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 40, Drill Unit: NESE

Wellbore Completed
Completion Date:6/2/1990
Spud Date:5/7/1990Spud Date Is:ACTUAL
Measured TD:7000 ft.Measured PB depth:6966 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL/GR, Z-DENSILOG/NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 480 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 480 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7000 ft., Weight: NA , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 5357 ft., Bottom: 7000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
HYGIENE3420 ft.
NIOBRARA6120 ft.
FORT HAYS6344 ft.
CODELL6398 ft.
BENTONITE6710 ft.
D SAND6816 ft.
J SAND6900 ft.

Formation JSND                     Formation Classification:  GW                     Status:  TA - 9/21/2023                 Interval Top: 6914 ft.    Interval Bottom: 6932 ft.

 Completed Information for Formation J SAND
1st Production Date:6/2/1990Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/23/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 4
CALC_GOR 112500
GRAVITY_OIL 60
MCF_GAS 450
TUBING_PRESS 600
Perforation Data:
Interval Top:6914 ft.# Of Holes:24
Interval Bottom:6932 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  TA - 9/21/2023                 Interval Top: 6134 ft.    Interval Bottom: 6240 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/10/2001Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2001
Treatment Summary:ACIDIZED W/2,000 GALS 15% HCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:6134 ft.# Of Holes:40
Interval Bottom:6240 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
01/29/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
06/30/2017
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No