Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14432
Well Classification: OW Status: PA - 4/14/2021
Well Name/No:HSR-FEDERAL #15-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 49190
Facility Status:PAStatus Date4/14/2021
FacilityID:246635LocationID:336303
County:WELD #123Location:SWSE 36 3N66W 6
Field:WATTENBERG - #90750Elevation:4993 ft.
Planned Location:660FSL  1980 FELLat/Long: 40.176327 / -104.723008Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.176511 / -104.723061Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/14/2021             Measured TD: 7999 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/14/2021
Wellbore Permit
Permit #:20031108 Expiration Date:6/24/2004
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:N/A
Spud Date:3/21/1990Spud Date Is:ACTUAL
Measured TD:7999 ft.Measured PB depth:7967 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:CDL-GR, ISP-GR, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 753 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 753 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7518 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6161 ft., Bottom: 7518 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1521 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 502 ft., Bottom: 1520 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7448 ft., Depth: 7968 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7448 ft., Bottom: 7968 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 502 ft., Depth: 1521 ft., Bottom: 1520 ft., Sacks: 215, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7113 ft.7358 ft.NN
FORT HAYS7358 ft.7382 ft.NN
CODELL7382 ft.7399 ft.NN
GREENHORN7469 ft.
J SAND7821 ft.7840 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 4/14/2021                 Interval Top: 7840 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation J SAND
1st Production Date:12/31/2003Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/2010
Treatment Summary:SET SAND PLUG @ 7620'. OUR INTENT IS TO REMOVE THE SAND PLUG TO COMMINGLE WELL IN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:115,460# 30/50 MESH SAND; 151,032 GALLONS GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7840 ft.# Of Holes:78
Interval Bottom:7892 ft.Hole Size:0.21 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/13/2011                Interval Top: 7383 ft.    Interval Bottom: 7399 ft.

 Completed Information for Formation CODELL
1st Production Date:5/18/1990Choke Size:0.140 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:24,000# 100 MESH; 500,000# 20-40 MESH SAND; 87,370 GALS GELLED FLUID
Tubing Size:2.375 in.Tubing Setting Depth:7321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/30/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 31
CALC_BBLS_H2O 0
CALC_BBLS_OIL 31
CALC_GOR 4839
CALC_MCF_GAS 150
CASING_PRESS 1600
GRAVITY_OIL 60
MCF_GAS 150
TUBING_PRESS 950
Perforation Data:
Interval Top:7383 ft.# Of Holes:32
Interval Bottom:7399 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/1/2004                  Interval Top: 7116 ft.    Interval Bottom: 7877 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/1/2004Choke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PLUNGER LIFT
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7968 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2004Test Method:PLUNGER
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 84667
CALC_MCF_GAS 254
CASING_PRESS 500
GRAVITY_OIL 45.8
MCF_GAS 254
TUBING_PRESS 200
Perforation Data:
Interval Top:7116 ft.# Of Holes:123
Interval Bottom:7877 ft.Hole Size:0.21 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/14/2021                 Interval Top: 7116 ft.    Interval Bottom: 7399 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/28/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/12/2010
Treatment Summary:NBRR PERF 7116-7180 HOLES 13 SIZE 0.38. CODL PERFF 7383-7399 HOLES 64 SIZE 0.38. REPEFRF CODL 7383-7399 HOLES 32 SIZE 0.38. REFRAC CODL W/201,621 GAL SW & 150,640# 40/70 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7338 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 39
BTU_GAS 1248
CALC_BBLS_H2O 0
CALC_BBLS_OIL 29
CALC_GOR 4586
CALC_MCF_GAS 133
CASING_PRESS 1675
GRAVITY_OIL 54
MCF_GAS 87
TUBING_PRESS 625
Perforation Data:
Interval Top:7116 ft.# Of Holes:77
Interval Bottom:7399 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/16/1991                 Interval Top: 7116 ft.    Interval Bottom: 7180 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/31/1991Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/31/2003
Treatment Summary:214,000# 20-40 MESH; 54,234 GALS GELLED WATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/1991Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 43
CALC_BBLS_H2O 0
CALC_BBLS_OIL 43
CALC_GOR 3512
CALC_MCF_GAS 151
CASING_PRESS 900
GRAVITY_OIL 60
MCF_GAS 151
TUBING_PRESS 625
Perforation Data:
Interval Top:7116 ft.# Of Holes:13
Interval Bottom:7180 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/14/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No