Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14316
Well Classification: GW Status: PA - 4/25/2017
Well Name/No:STATE LEASE #14-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67916
Facility Status:PAStatus Date4/25/2017
FacilityID:246519LocationID:327209
County:WELD #123Location:SWSW 28 6N63W 6
Field:WATTENBERG - #90750Elevation:4722 ft.
Planned Location:660FSL  656 FWLLat/Long: 40.451965 / -104.449002Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.452060 / -104.448920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/25/2017             Measured TD: 6915 ft.    Vertical TD: 6915 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/25/2017
Wellbore Permit
Permit #:890477 Expiration Date:10/5/1989
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:STATESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/2/1989
Measured TD:6915 ft.Measured PB depth:6825 ft.
True Vertical TD:6915 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 320 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 320 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6915 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6130 ft., Bottom: 6915 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6472 ft.
FORT HAYS6750 ft.
CODELL6773 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/6/2017                  Interval Top: 6773 ft.    Interval Bottom: 6786 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6773 ft.# Of Holes:24
Interval Bottom:6786 ft.Hole Size:

Formation FTHYS                   Formation Classification:  GW                   Status:  CM - 3/6/2017                  Interval Top: 6752 ft.    Interval Bottom: 6771 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/2/1989
Treatment Summary:The Fort Hays formation was completed during the original completion job 8/2/1989. Lyco Energy was the operator of this well at this time, so PDC has very limited information on the job done.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:6752 ft.# Of Holes:10
Interval Bottom:6771 ft.Hole Size:

Formation NBFHC                   Formation Classification:  GW                   Status:  AB - 4/25/2017                 Interval Top: 6496 ft.    Interval Bottom: 6786 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:8/3/1989Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBFHC.
Perforation Data:
Interval Top:6496 ft.# Of Holes:84
Interval Bottom:6786 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/6/2017                  Interval Top: 6496 ft.    Interval Bottom: 6697 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6496 ft.# Of Holes:50
Interval Bottom:6697 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  CM - 4/1/2016

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/3/1989Choke Size:1,264.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2023 - June 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No