|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2020 Measured TD: 7961 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2020 | Wellbore Permit | | Permit #: | 19980429 | Expiration Date: | 5/4/1999 | Proposed Depth/Form: | 7980 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE | Formation And Spacing: | Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 232 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 7/8/1989 | Spud Date Is: | ACTUAL | Measured TD: | 7961 ft. | Measured PB depth: | 7927 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | Log Types: | FDCN, ISP/C-, CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 612 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 285, Top: 0 ft., Bottom: 612 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7500 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 170, Top: 6540 ft., Bottom: 7500 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 3.875 in., Size: 2.875 in., Top: 7440 ft., Depth: 7961 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 25, Top: 7440 ft., Bottom: 7961 ft., Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 4090 ft., Depth: 4814 ft., Bottom: 4824 ft., Sacks: 350, Method: 1 INCH | Additional Cement: | String Type: 1ST , Top: 716 ft., Depth: 1200 ft., Bottom: 1284 ft., Sacks: 175, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7130 ft. | | N | N | FORT HAYS | 7319 ft. | | N | N | CODELL | 7340 ft. | | N | N | GREENHORN | 7424 ft. | | N | N | J SAND | 7800 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/16/2002 Interval Top: 7344 ft. Interval Bottom: 7358 ft. Completed Information for Formation CODELL | 1st Production Date: | 1/5/1990 | Choke Size: | 0.250 in. | Formation Name: | CODELL | Commingled: | | Production Method: | PLUNGER 500 | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/1/1998 | Treatment Summary: | FRAC'D W/24,000# 100 MESH SAND; 500,000# 20/40 MESH SAND; 88,550 GAL GELLED FLUID. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7304 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/12/1990 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 10 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 10 | CALC_GOR | 6500 | CALC_MCF_GAS | 65 | CASING_PRESS | 2250 | GRAVITY_OIL | 60 | MCF_GAS | 65 | TUBING_PRESS | 1200 |
| Perforation Data: | Interval Top: | 7344 ft. | # Of Holes: | 15 | Interval Bottom: | 7358 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/16/2002 Interval Top: 7132 ft. Interval Bottom: 7852 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 1/16/2002 | Choke Size: | 0.375 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | PLUNGER | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/1/1998 | Treatment Summary: | COMMINGLED JNBCD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7338 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/16/2002 | Test Method: | PLUNGER | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 10 | CALC_BBLS_OIL | 10 | CALC_GOR | 31300 | CALC_MCF_GAS | 313 | CASING_PRESS | 425 | GRAVITY_OIL | 60 | MCF_GAS | 313 | TUBING_PRESS | 260 |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: SI - 7/1/2020 Interval Top: 7132 ft. Interval Bottom: 7358 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/3/1998 | Choke Size: | 0.218 in. | Formation Name: | J SAND | Commingled: | | Production Method: | PLUNGER 500 | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/1/1998 | Treatment Summary: | FRAC'D JSND W/ 294,489 GALS FRACGEL 25,30,28,25,22 HT & 560,000# 20/40 OTTAWA SAND.(WAS SHUT IN FOR CODL REFRAC IN 2002). |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7478 ft. | Tubing Packer Depth: | 7391 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/3/1998 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 12 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 12 | CALC_GOR | 72000 | CALC_MCF_GAS | 864 | GRAVITY_OIL | 60 | MCF_GAS | 864 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | 31 | Interval Bottom: | 7358 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2017 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/7/1993 | Choke Size: | 0.375 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | PLUNGER | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/1/1998 | Treatment Summary: | (SEE CODL) NB: FRAC'D W/164,000# 20/40 MESH SAND + 52,641 GAL GELLED FLUID,1993. // REFRAC CODL W/261,000# 20/40 MESH & 86,222 GAL.GELLED FLUID. REPERF CODL 7344' - 7354', 2002. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7338 ft. | Tubing Packer Depth: | 7402 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/10/2002 | Test Method: | PLUNGER | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 4 | CALC_BBLS_OIL | 4 | CALC_GOR | 24750 | CALC_MCF_GAS | 99 | CASING_PRESS | 425 | GRAVITY_OIL | 60 | MCF_GAS | 99 | TUBING_PRESS | 260 |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2020 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|