|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/17/2015 Measured TD: 7535 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/17/2015 | | Wellbore Permit | | | Permit #: | 19881252 | Expiration Date: | 4/8/1989 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: S2SW |
| | |
| Wellbore Completed | | Completion Date: | 12/28/1988 | | Spud Date: | 12/19/1988 | Spud Date Is: | ACTUAL | | Measured TD: | 7535 ft. | Measured PB depth: | 7478 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL/SFL/GR; CBL; DEN/CNL/GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 592 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 11 ft., Bottom: 592 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7528 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6310 ft., Bottom: 7528 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 7574 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 25, Top: 6890 ft., Bottom: 7574 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6310 ft., Depth: 6794 ft., Bottom: 6794 ft., Sacks: 25, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7127 ft. | | | | | FORT HAYS | 7372 ft. | | | | | CODELL | 7394 ft. | | | | | GREENHORN | 7479 ft. | | | |
Formation CODL Formation Classification: OG Status: CM - 5/9/2012 Interval Top: 7394 ft. Interval Bottom: 7411 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/27/1990 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/28/2010 | | Treatment Summary: | REMOVE SAND PLUG SET @ 7350' TO COMMINGLE CODL W/NBRR. | | Formation Treatment | | Treatment Date: | 4/12/2010 | | Treatment Summary: | set sand plug @ 7350'. our intent is tgo remove the sand plug to commingle well within the next six months. | | Formation Treatment | | Treatment Date: | 6/4/1997 | | Treatment Summary: | CD PERF 7394-7411 HOLES 17 SIZE 0.38 | | Formation Treatment | | Treatment Date: | 7/29/1993 | | Treatment Summary: | 7394-7411' FRAC'D W/24,000# 100 MESH SAND; 500,000# 20/40 MESH SAND; 88,050 GAL GELLED FLUID.REPERF'D CODL FROM 7460'-7465' 05/30/02 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 4571 | | CALC_MCF_GAS | 32 | | CASING_PRESS | 485 | | GRAVITY_OIL | 60 | | MCF_GAS | 32 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7394 ft. | # Of Holes: | 17 | | Interval Bottom: | 7411 ft. | Hole Size: | 0.23 in. |
|
Formation NB-CD Formation Classification: OG Status: CM - 5/9/2012 Interval Top: 7129 ft. Interval Bottom: 7411 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/27/1990 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/28/2010 | | Treatment Summary: | NBRR PERF 7190-7304 HOLES 112 SIZE 0.16. CODL PERF 7460-7465 HOLES 52 SIZE 0.23. | | Formation Treatment | | Treatment Date: | 6/4/1997 | | Treatment Summary: | NB PERF 7129-7189 HOLES 17 SIZE 0.38
CD PERF 7394-7411 HOLES 17 SIZE 0.38 | | Formation Treatment | | Treatment Date: | 7/29/1993 | | Treatment Summary: | SEE CODL. NBRR: 7129-7189' FRAC'D W/230,100# 20/40 MESH SAND + 64,360 GAL GELLED FLUID. REFRAC NB-CD W/261,620# 20/40 MESH & 95,340 GAL GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 12 | | BTU_GAS | 1237 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 6334 | | CALC_MCF_GAS | 62 | | CASING_PRESS | 498 | | GRAVITY_OIL | 52 | | MCF_GAS | 76 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7129 ft. | # Of Holes: | 34 | | Interval Bottom: | 7411 ft. | Hole Size: | 0.23 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 5/9/2012 Interval Top: 7129 ft. Interval Bottom: 7189 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/27/1990 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 4/29/2010 | | Treatment Summary: | FRAC NBRR W/500 GAL 15% HC1 & 163,090 GAL VISTAR & 252,517# 40/70 SAND & 4,080# 20/40 SB EXCEL. | | Formation Treatment | | Treatment Date: | 6/4/1997 | | Treatment Summary: | NB PERF 7129-7189 HOLES 17 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1237 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 512 | | GRAVITY_OIL | 53 |
| | Perforation Data: | | Interval Top: | 7129 ft. | # Of Holes: | 17 | | Interval Bottom: | 7189 ft. | Hole Size: | 0.16 in. |
|
Sidetrack #01 Wellbore Classification: OW Status: PA - 8/17/2015 Measured TD: 7574 ft. Vertical TD: 7499 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PA - 8/17/2015 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19970387 | Expiration Date: | 5/28/1998 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 409 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/18/1997 | | Spud Date: | 6/20/1997 | Spud Date Is: | ACTUAL | | Measured TD: | 7574 ft. | Measured PB depth: | 7542 ft. | | True Vertical TD: | 7499 ft. | True Vertical PB depth: | 7469 ft. | | Top PZ Location: | Sec: Twp: | Footage: 480 FSL 1900 FWL | | Log Types: | GL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 582 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 582 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7528 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6310 ft., Bottom: , Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 3.875 in., Size: 2.875 in., Top: 6700 ft., Depth: 7574 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 25, Top: 6885 ft., Bottom: 7574 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7138 ft. | | N | N | | FORT HAYS | 7431 ft. | | N | N | | CODELL | 7455 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 7/27/2011 Interval Top: 7460 ft. Interval Bottom: 7465 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/21/1997 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/28/2010 | | Treatment Summary: | CD PERF 7460-7465 HOLES 52 SIZE 0.23
5/28/2010 -Cleaned out sand plug over Codell to commingle well
6/15/2010 -Commingled NB-CD | | Formation Treatment | | Treatment Date: | 7/18/1997 | | Treatment Summary: | FRAC'D CODL W/10,020# 100 MESH; 246;812# 20/40 MESH; 24,000# 12/20 MESH; 106,302 GAL GELLED FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4.63 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 37 | | CALC_GOR | 9503 | | CALC_MCF_GAS | 352 | | GRAVITY_OIL | 60 | | MCF_GAS | 352 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 52 | | Interval Bottom: | 7465 ft. | Hole Size: | 0.3 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/17/2015 Interval Top: 7190 ft. Interval Bottom: 7465 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/15/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/28/2010 | | Treatment Summary: | NB PERF 7190-7304 HOLES 112 SIZE 0.16 CD PERF 7460-7465 HOLES 52 SIZE 0.23
5/28/10 -CLEANED OUT SAND OVER CODL AND COMMINGLED NB-CD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6653 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/15/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1209 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 9000 | | CALC_MCF_GAS | 180 | | CASING_PRESS | 1450 | | GRAVITY_OIL | 51 | | MCF_GAS | 180 | | TUBING_PRESS | 1450 |
| | Perforation Data: | | Interval Top: | 7190 ft. | # Of Holes: | 164 | | Interval Bottom: | 7465 ft. | Hole Size: | 0.16 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 8/4/2011 Interval Top: 7190 ft. Interval Bottom: 7304 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/4/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2010 | | Treatment Summary: | NB PERF 7190-7304 HOLES 112 SIZE 0.16
Re-Frac Niobrara A & B & C down 4-1/2" Csg w/ 500 gal 15% HCl & 163,090 gal Vistar w/ 252,517# 40/70, 4,080# 20/40
5/4/2010 -Produced NBRR only
6/15/2010 -Commingled NB-CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7190 ft. | # Of Holes: | 112 | | Interval Bottom: | 7304 ft. | Hole Size: | 0.16 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/17/2015 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|