Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14149
Well Classification: OW Status: SI - 10/1/2022
Well Name/No:HUNGENBERG #4-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:56182
Facility Status:SIStatus Date10/1/2022
FacilityID:246352LocationID:327095
County:WELD #123Location:NWNW 20 6N65W 6
Field:GREELEY - #32760Elevation:4743 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  840 FWLLat/Long: 40.478684 / -104.693850Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.478889 / -104.693611Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2022             Measured TD: 7380 ft.    Vertical TD: 7380 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2022
Wellbore Permit
Permit #:881188 Expiration Date:3/28/1989
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/2/1988
Spud Date:11/22/1988Spud Date Is:ACTUAL
Measured TD:7380 ft.Measured PB depth:7206 ft.
True Vertical TD:7380 ft.True Vertical PB depth:7206 ft.
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 298 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 4.5 in., Size: 7.875 in., Top: 0 ft., Depth: 7206 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 6325 ft., Bottom: 7206 ft., Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 2930 ft., Bottom: 6014 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 492 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 20 ft., Bottom: 496 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 20 ft., Depth: 6014 ft., Bottom: 6014 ft., Sacks: 1120, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3780 ft.NN
NIOBRARA6865 ft.7059 ft.NN
FORT HAYS7140 ft.NN
CODELL7180 ft.NN
CARLILE7197 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  AB - 1/1/2012                  Interval Top: 7180 ft.    Interval Bottom: 7190 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/1988
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7180 ft.# Of Holes:
Interval Bottom:7190 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 10/1/2022                 Interval Top: 6860 ft.    Interval Bottom: 7074 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/14/2009Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2009
Treatment Summary:FRAC'D W/ 4,173 BBLS FRAC FLUID & 238,500 # OTTAWA 30/50 SAND & 12,000 # SB EXCEL 12/20
Tubing Size:2.375 in.Tubing Setting Depth:6832 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/14/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 36
BTU_GAS 1288
CALC_GOR 8056
CASING_PRESS 250
GRAVITY_OIL 53
MCF_GAS 290
TUBING_PRESS 200
Perforation Data:
Interval Top:6860 ft.# Of Holes:348
Interval Bottom:7074 ft.Hole Size:0.42 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/01/2024
Defined Inactive (SI )YDefined Inactive
09/30/2022
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No