Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13836
Well Classification: GW Status: PA - 3/27/2020
Well Name/No:HENRY #5-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67881
Facility Status:PAStatus Date3/27/2020
FacilityID:246039LocationID:326904
County:WELD #123Location:SENW 5 4N65W 6
Field:WATTENBERG - #90750Elevation:4677 ft.
Planned Location:2062FNL  1974 FWLLat/Long: 40.342785 / -104.689459Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.344026 / -104.689660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/27/2020             Measured TD: 7220 ft.    Vertical TD: 7220 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/27/2020
Wellbore PermitDRIFTED
Permit #:880095 Expiration Date:5/29/1988
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2NW

Wellbore Completed
Completion Date:2/25/1988
Spud Date:1/31/1988Spud Date Is:ACTUAL
Measured TD:7220 ft.Measured PB depth:7181 ft.
True Vertical TD:7220 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 333 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 333 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7211 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 6500 ft., Bottom: 7211 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6805 ft.
CODELL7106 ft.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 3/17/2020                 Interval Top: 7106 ft.    Interval Bottom: 7122 ft.

 Completed Information for Formation CODELL
1st Production Date:3/4/1988Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/25/1988
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7106 ft.# Of Holes:8
Interval Bottom:7122 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 3/27/2020                 Interval Top: 6802 ft.    Interval Bottom: 7026 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/4/1988Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/18/2008
Treatment Summary:FRAC'D W/4,161 BBLS FRAC FLUID & 238,320# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 11
BTU_GAS 1247
CALC_GOR 26364
CASING_PRESS 270
GRAVITY_OIL 66
MCF_GAS 290
TUBING_PRESS 0
Perforation Data:
Interval Top:6802 ft.# Of Holes:348
Interval Bottom:7026 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  CM - 3/9/1988

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/4/1988Choke Size:1,264.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/27/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No