Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13776
Well Classification: GW Status: PA - 7/25/2024
Well Name/No:TREBOR #B12-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:68641
Facility Status:PAStatus Date7/25/2024
FacilityID:245980LocationID:326857
County:WELD #123Location:SWNW 12 5N64W 6
Field:WATTENBERG - #90750Elevation:4600 ft.
Planned Location:1980FNL  660 FWLLat/Long: 40.415775 / -104.505783Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.416030 / -104.505360Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/25/2024             Measured TD: 6921 ft.    Vertical TD: 6921 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/25/2024
Wellbore Permit
Permit #:871058 Expiration Date:4/20/1988
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2NW

Wellbore Completed
Completion Date:1/11/1988
Measured TD:6921 ft.Measured PB depth:6908 ft.
True Vertical TD:6921 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 292 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 0 ft., Bottom: 292 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6883 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 5790 ft., Bottom: 6883 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6454 ft.
CODELL6736 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/8/2021                 Interval Top: 6736 ft.    Interval Bottom: 6748 ft.

 Completed Information for Formation CODELL
1st Production Date:2/18/1988Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/5/2011
Treatment Summary:Codell is under sand plug for Niobrara refrac
Formation Treatment
Treatment Date:8/24/2006
Treatment Summary:TRI-FRAC'D CODELL W/ 129,024 GALS OF VISTAR W/ 28# GEL LOADINGS & 246,360# OF 20/40 OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 6
CALC_BBLS_H2O 22
CALC_BBLS_OIL 71
CALC_GOR 11000
CALC_MCF_GAS 769
CASING_PRESS 460
MCF_GAS 70
TUBING_PRESS 300
Perforation Data:
Interval Top:6736 ft.# Of Holes:58
Interval Bottom:6748 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/25/2024                 Interval Top: 6456 ft.    Interval Bottom: 6748 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/18/1988Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/1988
Treatment Summary:COMMINGLE CODELL & NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 2
BTU_GAS 1290
CALC_GOR 19000
CASING_PRESS 450
MCF_GAS 38
TUBING_PRESS 300
Perforation Data:
Interval Top:6456 ft.# Of Holes:115
Interval Bottom:6748 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/8/2021                 Interval Top: 6456 ft.    Interval Bottom: 6648 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/18/1988Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/5/2011
Treatment Summary:Niobrara refrac Frac'd Niobrara w/151805 gals Vistar and Acid with 236880 lbs Ottawa sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 12
BTU_GAS 1320
CALC_BBLS_H2O 7
CALC_BBLS_OIL 12
CALC_GOR 8417
CALC_MCF_GAS 101
CASING_PRESS 200
MCF_GAS 101
Perforation Data:
Interval Top:6456 ft.# Of Holes:57
Interval Bottom:6648 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/25/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No