Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13387
Well Classification: OW Status: PA - 12/18/2019
Well Name/No:GATEWOOD #3-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:68436
Facility Status:PAStatus Date12/18/2019
FacilityID:245592LocationID:323698
County:WELD #123Location:NENW 1 5N65W 6
Field:WATTENBERG - #90750Elevation:4635 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:640FNL  2160 FWLLat/Long: 40.433255 / -104.613007Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.433333 / -104.612778Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/18/2019             Measured TD: 7060 ft.    Vertical TD: 7060 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/18/2019
Wellbore PermitDRIFTED
Permit #:870121 Expiration Date:7/2/1987
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/2/1987
Spud Date:3/6/1987Spud Date Is:ACTUAL
Measured TD:7060 ft.Measured PB depth:7047 ft.
True Vertical TD:7060 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 380 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 380 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 380 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7060 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6015 ft., Bottom: 7060 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7060 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6591 ft.
CODELL6891 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/27/2008                 Interval Top: 6891 ft.

 Completed Information for Formation CODELL
1st Production Date:2/27/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/18/2019                Interval Top: 6589 ft.    Interval Bottom: 6906 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/30/2017Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6589 ft.# Of Holes:372
Interval Bottom:6906 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/1/2017                  Interval Top: 6589 ft.    Interval Bottom: 6803 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/27/2008Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/2008
Treatment Summary:FRAC'D W/ 4,436 BBLS FRAC FLUID & 238,520# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6582 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BBLS_OIL 90
BTU_GAS 1234
CALC_GOR 3133
CASING_PRESS 400
GRAVITY_OIL 51
MCF_GAS 282
TUBING_PRESS 350
Perforation Data:
Interval Top:6589 ft.# Of Holes:372
Interval Bottom:6803 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/18/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No