|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/31/2022 Measured TD: 6974 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/31/2022 | | Wellbore Permit | | | Permit #: | 860825 | Expiration Date: | 4/7/1978 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/23/1986 | | Measured TD: | 6974 ft. | Measured PB depth: | 6961 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 308 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 308 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6974 ft., Weight: 15.1 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 5850 ft., Bottom: 6974 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5210 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1263, Top: 0 ft., Bottom: 5220 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6515 ft. | | | | | CODELL | 6794 ft. | | | |
Formation CODL Formation Classification: Status: CM - 3/1/2021 Interval Top: 6794 ft. Interval Bottom: 6808 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 4 | | Interval Bottom: | 6808 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/31/2022 Interval Top: 6517 ft. Interval Bottom: 6808 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/23/1986 | | Treatment Summary: | FRAC W/275,100# 20/40 SAND - 138,228 GALS. FRAC FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 6 | | CALC_MCF_GAS | 56 | | CASING_PRESS | 675 | | MCF_GAS | 56 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 6517 ft. | # Of Holes: | 16 | | Interval Bottom: | 6808 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 3/1/2021 Interval Top: 6517 ft. Interval Bottom: 6706 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6517 ft. | # Of Holes: | 12 | | Interval Bottom: | 6706 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/31/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|