Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13218
Well Classification: GW Status: PA - 1/15/2021
Well Name/No:HAYES #1-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62723
Facility Status:PAStatus Date1/15/2021
FacilityID:245423LocationID:323575
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N66W 6
Field:WATTENBERG - #90750Elevation:4945 ft.
Planned Location:570FNL  500 FELLat/Long: 40.390654 / -104.795952Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.390230 / -104.796090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/15/2021             Measured TD: 7516 ft.    Vertical TD: 7516 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/15/2021
Wellbore Permit
Permit #:860679 Expiration Date:2/15/1987
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/12/1986
Measured TD:7516 ft.Measured PB depth:7510 ft.
True Vertical TD:7516 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 515 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 515 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7550 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6610 ft., Bottom: 7550 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2950 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 2746 ft., Bottom: 2950 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7048 ft.
CODELL7382 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/27/1999                 Interval Top: 7383 ft.    Interval Bottom: 7400 ft.

 Completed Information for Formation CODELL
1st Production Date:12/12/1986Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/28/2010
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7383 ft.# Of Holes:47
Interval Bottom:7400 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/15/2021                 Interval Top: 7067 ft.    Interval Bottom: 7400 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/12/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/28/2010
Treatment Summary:NBRR PERF 7067-7273 HOLES 64 SIZE 0.38. CODL PERF 7383-7400 HOLES 47 SIZE 0.38.
Tubing Size:2.375 in.Tubing Setting Depth:7338 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/24/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1266
CALC_BBLS_OIL 3
CALC_GOR 14000
CALC_MCF_GAS 42
CASING_PRESS 404
GRAVITY_OIL 56
TUBING_PRESS 389
Perforation Data:
Interval Top:7067 ft.# Of Holes:111
Interval Bottom:7400 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/23/2010                Interval Top: 7067 ft.    Interval Bottom: 7273 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/12/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/28/2010
Treatment Summary:FRAC NBR w/ 504 gal 15% HC1 & 249,787 gal sw & 200,360# 40/70 sand & 4,260# SB excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7067 ft.# Of Holes:64
Interval Bottom:7273 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No