Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13152
Well Classification: GW Status: SI - 11/5/2025
Well Name/No:CITY OF GREELEY #1-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62693
Facility Status:SIStatus Date11/5/2025
FacilityID:245357LocationID:323525
Municipality/County:EVANS / WELD #123Location:NESW 30 5N65W 6
Field:WATTENBERG - #90750Elevation:4672 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1592FSL  2151 FWLLat/Long: 40.367335 / -104.708029Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.367356 / -104.708100Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/5/2025             Measured TD: 7250 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/5/2025
Wellbore Permit
Permit #:860570 Expiration Date:1/6/1987
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/10/1987
Spud Date:9/18/1986Spud Date Is:ACTUAL
Measured TD:7250 ft.Measured PB depth:7209 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 515 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 515 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 515 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7250 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6050 ft., Bottom: 7250 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7250 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6770 ft.
CODELL7098 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/5/2025                 Interval Top: 7099 ft.    Interval Bottom: 7115 ft.

 Completed Information for Formation CODELL
1st Production Date:2/9/1987Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7099 ft.# Of Holes:46
Interval Bottom:7115 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 11/5/2025                 Interval Top: 6795 ft.    Interval Bottom: 7115 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/5/1990Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/18/2007
Treatment Summary:TRIFRAC NB-CD W/161,041 GAL FLUID & 120,000# 40/70 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1242
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 24500
CALC_MCF_GAS 49
CASING_PRESS 360
GRAVITY_OIL 61
TUBING_PRESS 300
Perforation Data:
Interval Top:6795 ft.# Of Holes:61
Interval Bottom:7115 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/5/2025                 Interval Top: 6795 ft.    Interval Bottom: 7006 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/6/1990Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6795 ft.# Of Holes:15
Interval Bottom:7006 ft.Hole Size:0.38 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY02/22/2026
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined Inactive (SI)YLast Production
01/18/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No