|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/11/2018 Measured TD: 6859 ft. Vertical TD: 6859 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/11/2018 | Wellbore Permit | DRIFTED | Permit #: | 851115 | Expiration Date: | 12/20/1985 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/15/1985 | Measured TD: | 6859 ft. | Measured PB depth: | 6845 ft. | True Vertical TD: | 6859 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 305 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 294, Top: 0 ft., Bottom: 305 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 315 ft., Weight: 24 , Citings Type: HISTORICAL | Cement: | Sacks: 294, Top: 0 ft., Bottom: 315 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 6859 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 5734 ft., Bottom: 6859 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6859 ft., Weight: 17 , Citings Type: HISTORICAL | Cement: | Sacks: 250, Top: 5747 ft., Bottom: 6859 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 415, Top: 2994 ft., Bottom: 5200 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6436 ft. | | | | FORT HAYS | 6759 ft. | | | | CODELL | 6794 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/5/2017 Interval Top: 6840 ft. Interval Bottom: 7135 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/28/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6840 ft. | # Of Holes: | 52 | Interval Bottom: | 7135 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 12/11/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|