|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2022 Measured TD: 8122 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2022 | Wellbore Permit | | Permit #: | 20030857 | Expiration Date: | 5/18/2004 | Prop Depth/Form: | 8122 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 8/25/2003 | Spud Date: | 1/3/1985 | Spud Date Is: | ACTUAL | Measured TD: | 8122 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL IND., COMP DENS. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8122 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 6646 ft., Bottom: 8122 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4350 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 4168 ft., Bottom: 4360 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4410 ft. | | N | N | SHANNON | 4848 ft. | | N | N | NIOBRARA | 7278 ft. | | N | N | TIMPAS | 7520 ft. | | N | N | CODELL | 7544 ft. | | N | N | GREENHORN | 7609 ft. | | N | N | J SAND | 7987 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7980 ft. Interval Bottom: 8012 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/28/1985 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/2003 | Treatment Summary: | ACIDIZED W/ 1,000 GALS 7.5% HCL ACID; FRAC'D W/ 115,000 GALS POLARIS 40, 325,000# 20-40 SAND, FLUSHED W/ 5,200 GALS 2% KCL WATER |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7935 ft. | Tubing Packer Depth: | 7935 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/28/1985 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 45 | BBLS_OIL | 0 | CALC_BBLS_H2O | 45 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 441 | CASING_PRESS | 400 | MCF_GAS | 441 | TUBING_PRESS | 160 |
| Perforation Data: | Interval Top: | 7980 ft. | # Of Holes: | 100 | Interval Bottom: | 8012 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7548 ft. Interval Bottom: 7557 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/1/2003 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/2003 | Treatment Summary: | SEE SCANNED DOC# 1157262 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/1/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 17 | BBLS_OIL | 22 | CALC_BBLS_H2O | 17 | CALC_BBLS_OIL | 22 | CALC_GOR | 6034 | CALC_MCF_GAS | 132 | MCF_GAS | 132 | TUBING_PRESS | 125 |
| Perforation Data: | Interval Top: | 7548 ft. | # Of Holes: | 36 | Interval Bottom: | 7557 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 8/25/2003 Interval Top: 7548 ft. Interval Bottom: 8012 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 8/25/2003 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/2003 | Treatment Summary: | RIH W/TBG. DRILL OUT CIBP [IN JSND]. POOH. RIH W/ PROD TBG. LAND TBG @ 7953'. SWAB. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7953 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/25/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 28 | CALC_BBLS_H2O | 5 | CALC_BBLS_OIL | 28 | CALC_GOR | 4071 | CALC_MCF_GAS | 114 | CASING_PRESS | 670 | MCF_GAS | 114 | TUBING_PRESS | 210 |
| Perforation Data: | Interval Top: | 7548 ft. | # Of Holes: | 136 | Interval Bottom: | 8012 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2022 |
Low Producing | Y | Production Period 07/2023 - 06/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|