|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 4/10/2019 Measured TD: 6990 ft. Vertical TD: 6990 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 4/10/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 841338 | Expiration Date: | 1/18/1985 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/18/1985 | | Spud Date: | 11/26/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 6990 ft. | Measured PB depth: | 6990 ft. | | True Vertical TD: | 6990 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 346 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6979 ft., Weight: 11.6 , Citings Type: HISTORICAL | | Cement: | Sacks: 250, Top: 5850 ft., Bottom: 6979 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4255 ft. | | | | | SHANNON | 5168 ft. | | | | | NIOBRARA | 6620 ft. | | | | | FORT HAYS | 6785 ft. | | | | | CODELL | 6808 ft. | | | | | GREENHORN | 6862 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 3/6/2017 Interval Top: 6851 ft. Interval Bottom: 6868 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/18/1985 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/1985 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6851 ft. | # Of Holes: | 5 | | Interval Bottom: | 6868 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: TA - 4/10/2019 Interval Top: 6568 ft. Interval Bottom: 6868 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/17/2015 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6568 ft. | # Of Holes: | 267 | | Interval Bottom: | 6868 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/6/2017 Interval Top: 6568 ft. Interval Bottom: 6758 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/18/1985 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/19/2008 | | Treatment Summary: | 238080# 30/50 OTTAWA SAND PLUS 12000# 12/20 SAND FRAC WITH 4047 BBLS CROSS LINKED & SILVERSTIM FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 35 | | BTU_GAS | 1357 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 6829 | | CALC_MCF_GAS | 239 | | CASING_PRESS | 600 | | GRAVITY_OIL | 56 | | MCF_GAS | 239 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 6568 ft. | # Of Holes: | 267 | | Interval Bottom: | 6758 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/06/2022 |
| Defined Inactive (TA ) | Y | Defined Inactive 02/28/2019 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|