|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2017 Measured TD: 5450 ft. Vertical TD: 5162 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2017 | | Wellbore Permit | | | Permit #: | 19831345 | Expiration Date: | 2/25/1984 | | Proposed Top PZ Location: | Sec:31 Twp: 2N 67W | Footage: 680 FNL 812 FWL | | Bottom Hole Location: | Sec:31 Twp: 2N 67W | Footage: 563 FNL 1334 FWL | | Proposed Depth/Form: | 5500 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 40, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/8/1984 | | Spud Date: | 10/25/1983 | Spud Date Is: | ACTUAL | | Measured TD: | 5450 ft. | Measured PB depth: | 5415 ft. | | True Vertical TD: | 5162 ft. | True Vertical PB depth: | 5130 ft. | | Log Types: | DIL-SFL-SP FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 980 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: , Depth: 5450 ft., Weight: 5.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4810 ft. | | N | N | | SHANNON | 5294 ft. | | N | N |
Formation SNSD Formation Classification: OW Status: CM - 2/4/1984 Interval Top: 5294 ft. Interval Bottom: 5324 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 2/4/1984 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/8/1984 | | Treatment Summary: | 1,190 BO X 800 BW X 256,000# 20-40 SN X 10,000# 20-40 RESIN CTD SN |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SNSD. |
| | Perforation Data: | | Interval Top: | 5294 ft. | # Of Holes: | 120 | | Interval Bottom: | 5324 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: OW Status: CM - 2/4/1984 Interval Top: 4816 ft. Interval Bottom: 4886 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 2/4/1984 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/8/1984 | | Treatment Summary: | 642 BLW X 1,300 BLO X 305,000# 20-40 SN X 15,000# 20-40 RESIN SND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SUSX. |
| | Perforation Data: | | Interval Top: | 4816 ft. | # Of Holes: | 280 | | Interval Bottom: | 4886 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: OW Status: PR - 7/1/2017 Interval Top: 4816 ft. Interval Bottom: 5324 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 2/4/1984 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/8/1984 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 3703 | | CALC_MCF_GAS | 100 | | GRAVITY_OIL | 42 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 4816 ft. | # Of Holes: | 400 | | Interval Bottom: | 5324 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1370 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.643 |
| Average MCFE per Day | 3.732 |
| Federal Financial Assurance | i | |
|
|