Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-11327
Well Classification: OW Status: PA - 8/21/2019
Well Name/No:HAYS #31-1H5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61563
Facility Status:PAStatus Date8/21/2019
FacilityID:243535LocationID:319474
County:WELD #123Location:NENE 31 5N65W 6
Field:WATTENBERG - #90750Elevation:4650 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:668FNL  662 FELLat/Long: 40.361115 / -104.698919Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.361102 / -104.699253Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/24/2019             Measured TD: 7226 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/24/2019
Wellbore PermitDRIFTED
Permit #:932030 Expiration Date:4/28/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:3/4/1994
Measured TD:7226 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 488 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 488 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 4450 ft., Weight: 7.70 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 3700 ft., Bottom: 4700 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7217 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 6352 ft., Bottom: 7217 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3601 ft.
SUSSEX4076 ft.
NIOBRARA6758 ft.
FORT HAYS7064 ft.
CODELL7086 ft.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/21/2019                 Interval Top: 6760 ft.    Interval Bottom: 7090 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/26/1994Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2011
Treatment Summary:Codell & Niobrara are commingled Niobrara refrac; nothing new happened in Codell
Formation Treatment
Treatment Date:3/4/1994
Treatment Summary:93,199 GAL FLUID & 418,500# 20/40 SAND, 2/28/1994
Tubing Size:2.0625 in.Tubing Setting Depth:7042 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 19
BTU_GAS 1284
CALC_BBLS_H2O 15
CALC_BBLS_OIL 19
CALC_GOR 9263
CALC_MCF_GAS 176
CASING_PRESS 540
GRAVITY_OIL 65
MCF_GAS 176
TUBING_PRESS 250
Perforation Data:
Interval Top:6760 ft.# Of Holes:211
Interval Bottom:7090 ft.Hole Size:0.3 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/9/2011                  Interval Top: 6760 ft.    Interval Bottom: 6904 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/26/1994Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2011
Treatment Summary:Niobrara refrac Frac'd Niobrara w/148046 gals Vistar, Acid, and Slick Water with 249840 lbs Ottawa sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6760 ft.# Of Holes:134
Interval Bottom:6904 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/21/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No