|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/13/2020 Measured TD: 7100 ft. Vertical TD: 7100 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/13/2020 | | Wellbore Permit | | | Permit #: | 830305 | Expiration Date: | 7/29/1983 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/10/1985 | | Measured TD: | 7100 ft. | Measured PB depth: | 7048 ft. | | True Vertical TD: | 7100 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 0 ft., Bottom: 211 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7102 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 5550 ft., Bottom: 7102 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3380 ft. | | | | | NIOBRARA | 6246 ft. | | | | | FORT HAYS | 6480 ft. | | | | | CODELL | 6503 ft. | | | | | GREENHORN | 6565 ft. | | | | | J SAND | 6956 ft. | | | | | SKULL CREEK | 7085 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 11/18/2019 Interval Top: 6503 ft. Interval Bottom: 6514 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/10/1985 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/18/2019 | Treatment End Date: | N/A | | Treatment Summary: | Original completion in 1985: 6508'-6514', 10 holes. Codell recompleted in 11/2007: 6503'-6514', 44 holes. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6503 ft. | # Of Holes: | 54 | | Interval Bottom: | 6514 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/13/2020 Interval Top: 6254 ft. Interval Bottom: 6514 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/10/1985 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/18/2019 | Treatment End Date: | N/A | | Treatment Summary: | Original completion in 1985: 20 holes
Recompletion in 11/2007: 100 holes | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 11/13/2007 | | Treatment Summary: | FRAC CODL W/130,000 GAL DYNAFLOW II AND 245,000 LBS 20/40 SET PLUG AND FRAC NBRR W/130,000 GAL DYNAFLOW II AND 260,000 LBS OF 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 13 | | BTU_GAS | 1233 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 2153 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 39 | | MCF_GAS | 28 | | TUBING_PRESS | 700 |
| | Perforation Data: | | Interval Top: | 6254 ft. | # Of Holes: | 120 | | Interval Bottom: | 6514 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/18/2019 Interval Top: 6254 ft. Interval Bottom: 6402 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/10/1985 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/18/2019 | Treatment End Date: | N/A | | Treatment Summary: | Original Completion in 1985: 6334'-6344', 10 holes. Niobrara was recompleted in 11/2007: 6254'-6402', 56 holes. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6254 ft. | # Of Holes: | 66 | | Interval Bottom: | 6402 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/13/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|