|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/23/2017 Measured TD: 8285 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/23/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19980684 | Expiration Date: | 7/27/1999 | | Proposed Depth/Form: | 8550 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 318A , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 5/1/1983 | | Spud Date: | 9/17/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 8285 ft. | Measured PB depth: | 8219 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | SP-IES FDG-GR CALIPER FDCNGR, IGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 675, Top: 0 ft., Bottom: 960 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8285 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1495, Top: 3862 ft., Bottom: 8285 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1400 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 1400 ft., Determination Method: CALC | | Casing: | String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 8390 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4550 ft. | | N | N | | SHANNON | 5225 ft. | | N | N | | NIOBRARA | 7349 ft. | | N | N | | CODELL | 7694 ft. | | N | N | | J SAND | 8138 ft. | | N | N | | DAKOTA | 8304 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 5/23/2017 Interval Top: 8304 ft. Interval Bottom: 8390 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 8/24/1998 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | Yes | | Production Method: | PLUNGER LIFT | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 8304 ft. | # Of Holes: | | | Interval Bottom: | 8390 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 5/23/2017 Interval Top: 8136 ft. Interval Bottom: 8172 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/1/1983 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/1/1983 | | Treatment Summary: | FRAC - 5 29 BLC X 3217 BLW X 428800 20/40 SN - FLUSH X 211 BLW |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8140 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/1/1983 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 780 | | GRAVITY_OIL | 56 | | MCF_GAS | 780 |
| | Perforation Data: | | Interval Top: | 8136 ft. | # Of Holes: | | | Interval Bottom: | 8172 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 5/23/2017 Interval Top: 7691 ft. Interval Bottom: 7714 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/20/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/1/1983 | | Treatment Summary: | DIVERTAFRAC: PUMPED 71 BBLS OF POLYMER GEL. PUMPED 217 BBLS OF POLYMER GEL WITH 4500 LBS OF 20/40 SAND. FLUSHED WITH 101 BBLS OF 2% KCL. CODEL FRAC: PUMPED 429 BBLS OF POLYMER GEL. PUMPED 798 POLYMER GEL WITH 188,000 LBS OF 20/40 SAND. FLUSHED WITH 30 BBLS OF KCL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 75 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 75 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 2142 | | CALC_MCF_GAS | 15 | | MCF_GAS | 15 |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | 97 | | Interval Bottom: | 7714 ft. | Hole Size: | 0.38 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 2/3/1999 Interval Top: 7691 ft. Interval Bottom: 8172 ft.| Completed Information for Formation DAKOTA-J-CODELL | | 1st Production Date: | 8/24/1998 | Choke Size: | | | Formation Name: | DAKOTA-J-CODELL | Commingled: | Yes | | Production Method: | PLUNGER LIFT | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 5/1/1983 | | Treatment Summary: | FRAC'D DAKOTA W/3300# 100 MESH; 36000# 20/40 MESH; 11,823 GAL GELLED FLUID. COMMINGLED WITH J-CDL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8270 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/31/1998 | Test Method: | PLUNGER 500 | | Hours Tested: | 2 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 30500 | | CALC_MCF_GAS | 732 | | CASING_PRESS | 675 | | GRAVITY_OIL | 49 | | MCF_GAS | 61 | | TUBING_PRESS | 575 |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | | | Interval Bottom: | 8172 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/3/1999 Interval Top: 7691 ft. Interval Bottom: 8172 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 4/30/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8126 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/30/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 7 | | CALC_GOR | 4000 | | MCF_GAS | 28 |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | | | Interval Bottom: | 8172 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/23/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|