Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10610
Well Classification: OW Status: PA - 11/8/2018
Well Name/No:HARRINGTON #2-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:56650
Facility Status:PAStatus Date11/8/2018
FacilityID:242819LocationID:319063
County:WELD #123Location:NENW 30 6N66W 6
Field:BRACEWELL - #7487Elevation:4727 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  2517 FWLLat/Long: 40.463873 / -104.823494Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.464087 / -104.823391Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/8/2018             Measured TD: 7685 ft.    Vertical TD: 7685 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/8/2018
Wellbore PermitDRIFTED
Permit #:820432 Expiration Date:7/15/1982
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 390, Drill Unit:

Wellbore Completed
Completion Date:5/4/1982
Measured TD:7685 ft.Measured PB depth:7632 ft.
True Vertical TD:7685 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 195 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 195 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7664 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 1300, Top: 5012 ft., Bottom: 7685 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4294 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 3422 ft., Bottom: 4294 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4260 ft.
SHANNON4615 ft.
NIOBRARA6800 ft.
CODELL7090 ft.
J SAND7558 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 5/7/2018                  Interval Top: 7564 ft.    Interval Bottom: 7594 ft.

 Completed Information for Formation J SAND
1st Production Date:5/4/2018Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/22/2017Treatment End Date:N/A
Treatment Summary:7564-7594 Abandoned.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/4/1982
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
MCF_GAS 7
Perforation Data:
Interval Top:7564 ft.# Of Holes:60
Interval Bottom:7594 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  AB - 6/22/2017                 Interval Top: 7094 ft.    Interval Bottom: 7106 ft.

 Completed Information for Formation CODELL
1st Production Date:5/24/1982Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/1982
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6776 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_GOR 14000
MCF_GAS 7
Perforation Data:
Interval Top:7094 ft.# Of Holes:64
Interval Bottom:7106 ft.Hole Size:

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 12/8/1988                 Interval Top: 4268 ft.    Interval Bottom: 4294 ft.

 Completed Information for Formation SUSSEX
1st Production Date:8/23/1982Choke Size: 
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/1982
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SUSX.
Perforation Data:
Interval Top:4268 ft.# Of Holes:
Interval Bottom:4294 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/08/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No