|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/12/2021 Measured TD: 7992 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/12/2021 | Wellbore Permit | | Permit #: | 20052298 | Expiration Date: | 8/14/2006 | Proposed Depth/Form: | 7870 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 218 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 160, Top: 0 ft., Bottom: 218 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7870 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: , Bottom: 7870 ft. |
| | |
Wellbore Completed | Completion Date: | 12/18/1998 | Spud Date: | 8/15/1981 | Spud Date Is: | ACTUAL | Measured TD: | 7992 ft. | Measured PB depth: | 7992 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | GR-CCL, FDC; ISF | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 218 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: 160 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7870 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6640 ft., Bottom: 7870 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 850 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 550 ft., Bottom: 850 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1250 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: , Bottom: 1250 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 667 ft. | | N | N | PIERRE | 930 ft. | | N | N | SUSSEX | 4506 ft. | | N | N | NIOBRARA | 6933 ft. | | N | N | FORT HAYS | 7244 ft. | | N | N | CARLILE | 7266 ft. | | N | N | GREENHORN | 7324 ft. | | N | N | D SAND | 7653 ft. | | N | N | J SAND | 7710 ft. | | N | N | SKULL CREEK | 7751 ft. | | N | N | DAKOTA | 7909 ft. | 7992 ft. | N | N |
Formation DKTA Formation Classification: OW Status: AB - 4/12/2021 Interval Top: 7909 ft. Interval Bottom: 7992 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 11/1/1998 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/18/1998 | Treatment Summary: | FRAC OPEN HOLE DAKOTA WITH 36,750 GAL HYBOR 35, 40,880# 20/40 SAND AND 4000# ACFRAC. SAND PLUG, SEE J SAND ABOVE. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1100 | CALC_BBLS_H2O | 8 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 57 | CASING_PRESS | 520 | TUBING_PRESS | 175 |
| Perforation Data: | Interval Top: | 7909 ft. | # Of Holes: | 50 | Interval Bottom: | 7992 ft. | Hole Size: | 0.36 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 12/18/1998 Interval Top: 7712 ft. Interval Bottom: 7992 ft. Completed Information for Formation DAKOTA-JSND | 1st Production Date: | 12/18/1998 | Choke Size: | 0.500 in. | Formation Name: | DAKOTA-JSND | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 12/18/1998 | Treatment Summary: | FRAC OPEN HOLE DAKOTA WITH 36,750 GALS HYBOR 35, 40,880# 20/40 SAND, & 4000# ACFRAC BLACK IS PROPANT DOWN TUBING WITH PACKER SET BELOW J PERFORATIONS. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7687 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/18/1998 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 8.5 | BTU_GAS | 1100 | CALC_BBLS_H2O | 8.5 | CALC_MCF_GAS | 57 | CASING_PRESS | 520 | MCF_GAS | 57 | TUBING_PRESS | 175 |
| Perforation Data: | Interval Top: | 7712 ft. | # Of Holes: | | Interval Bottom: | 7992 ft. | Hole Size: | |
|
Formation JSND Formation Classification: OW Status: AB - 4/12/2021 Interval Top: 7712 ft. Interval Bottom: 7746 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/5/1982 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/3/1982 | Treatment Summary: | FRAC WITH 105,000 GAL VERSA GEL FLUID, 15,000# 100 MESH SAND, 300,000# 20/40 SAND AND 38 TONS CARBON DIOXIDE. 11/08/05 RU AND PUMP 15 BBLS 2% KCL WATER WITH 2100# 20/40 FRAC SAND TO SPOT SAND PLUG ACROSS THE J SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 4 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 4 | CALC_GOR | 130000 | CALC_MCF_GAS | 520 | CASING_PRESS | 150 | MCF_GAS | 520 |
| Perforation Data: | Interval Top: | 7712 ft. | # Of Holes: | 50 | Interval Bottom: | 7746 ft. | Hole Size: | 0.36 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/1/2007 Interval Top: 7270 ft. Interval Bottom: 7280 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/2/2005 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/21/2005 | Treatment Summary: | FRAC'D WITH 161,946 GAL SLICK WATER GEL WITH 116,260# 20/40 FRAC SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7270 ft. | # Of Holes: | 20 | Interval Bottom: | 7280 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/1/2007 Interval Top: 7035 ft. Interval Bottom: 7746 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/28/2007 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/18/1998 | Treatment Summary: | DRILL OUT SAND PLUG TO BELOW EXISTING J SAND PERFORATIONS, COMMINGLE J SAND WITH NIOBRARA-CODELL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JNBCD. |
| Perforation Data: | Interval Top: | 7035 ft. | # Of Holes: | 50 | Interval Bottom: | 7746 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/12/2021 Interval Top: 7035 ft. Interval Bottom: 7280 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/5/2005 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/21/2005 | Treatment Summary: | FRAC'D WITH 161,946 GAL SLICK WATER WITH 116,260# FRAC SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 14 | CALC_GOR | 3929 | CALC_MCF_GAS | 55 |
| Perforation Data: | Interval Top: | 7035 ft. | # Of Holes: | 50 | Interval Bottom: | 7280 ft. | Hole Size: | 0.36 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/1/2007 Interval Top: 7035 ft. Interval Bottom: 7138 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/2/2005 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/21/2005 | Treatment Summary: | FRAC'D WITH 161,946 GAL SLICK WATER GEL WITH 116,230# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7035 ft. | # Of Holes: | 10 | Interval Bottom: | 7138 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/12/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|