Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10161
Well Classification: GW Status: PA - 11/21/2022
Well Name/No:FT ST VRAIN #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/21/2022
FacilityID:242370LocationID:318878
County:WELD #123Location:SESE 9 3N67W 6
Field:WATTENBERG - #90750Elevation:4762 ft.
Planned Location:990FSL  1100 FELLat/Long: 40.235570 / -104.891120Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.235574 / -104.891111Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/21/2022             Measured TD: 7596 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/21/2022
Wellbore Permit
Permit #: Expiration Date:8/3/2012
Prop Depth/Form:7766 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 239 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 10 ft., Bottom: 239 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7596 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 5760 ft., Bottom: 7596 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:6/13/1981Spud Date Is:ACTUAL
Measured TD:7596 ft.Measured PB depth:7587 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IES, DINSITY, GAMMA RAY COLLAR, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 239 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 239 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7596 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 5640 ft., Bottom: 7596 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7596 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 3082 ft., Bottom: 4640 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7596 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 82 ft., Bottom: 1160 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 7760 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6787 ft.NN
CODELL7086 ft.NN
GREENHORN7206 ft.NN
BENTONITE7340 ft.NN
J SAND7514 ft.NN
DAKOTA7706 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 11/21/2022                Interval Top: 7708 ft.    Interval Bottom: 7752 ft.

 Completed Information for Formation DAKOTA
1st Production Date:9/3/1998Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:9/3/2010
Treatment Summary:Set sand plug @ 7310'.
Formation Treatment
Treatment Date:6/27/1981
Treatment Summary:FRAC'D DKTA W/3640# 100 MESH; 45160# 20/40; 12700# CARBOLITE; 23352 GAL GELLED FLUID. DEEPENED TO DAKOTA AND COMMINGLED W/J-CDL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 44600
CALC_MCF_GAS 223
CASING_PRESS 400
MCF_GAS 223
TUBING_PRESS 200
Perforation Data:
Interval Top:7708 ft.# Of Holes:
Interval Bottom:7752 ft.Hole Size:

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/21/2022                Interval Top: 7514 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation J SAND
1st Production Date:1/25/1981Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/3/2010
Treatment Summary:Set sand plug @ 7310'.
Formation Treatment
Treatment Date:6/27/1981
Treatment Summary:1000 GAL 7.5% BDA, 184388 GAL GEL 360000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 1
CALC_BBLS_OIL 33
CALC_MCF_GAS 1700
Perforation Data:
Interval Top:7514 ft.# Of Holes:46
Interval Bottom:7564 ft.Hole Size:

Formation CODL                     Formation Classification:  OG                     Status:  CM - 12/11/2013                Interval Top: 7087 ft.    Interval Bottom: 7107 ft.

 Completed Information for Formation CODELL
1st Production Date:8/23/1991Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/16/2012Treatment End Date:N/A
Treatment Summary:CD PERF 7087-7107 SHOTS 70 SIZE .38 5/8/2012 - Cleared out sand plug over JS to commingle well
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/13/2010
Treatment Summary:Reperf CODL 7091-7107 Holes 16 Size 0.38. Trifrac CODL w/ 118,608 gal Vistar & 261,080# 20/40 sand & 4,200# SB Excel.
Formation Treatment
Treatment Date:6/27/1981
Treatment Summary:REFRAC CODL # 100 MESH 261350 # 20/40 MSH 87864 GAL. GELLED FLUID REPERFORATE CODELL FROM 7088'-7098' TEST PRODUCTION REPRESENTS CODL FORMATIONS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 8400
CALC_MCF_GAS 42
CASING_PRESS 650
GRAVITY_OIL 5
MCF_GAS 42
TUBING_PRESS 450
Perforation Data:
Interval Top:7087 ft.# Of Holes:70
Interval Bottom:7107 ft.Hole Size:0.38 in.

Formation DKJNC                   Formation Classification:  OG                   Status:  CM - 5/20/2012                 Interval Top: 6830 ft.    Interval Bottom: 7752 ft.

 Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL
1st Production Date:5/16/2012Choke Size: 
Formation Name:DAKOTA-J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/20/2012
Treatment Summary:5/8/2012 - Cleared out sand plug over JS to commingle well
Tubing Size:2.375 in.Tubing Setting Depth:7564 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1306
CALC_BBLS_OIL 1
CALC_GOR 15000
CALC_MCF_GAS 15
CASING_PRESS 622
GRAVITY_OIL 54
MCF_GAS 15
TUBING_PRESS 628
Perforation Data:
Interval Top:6830 ft.# Of Holes:176
Interval Bottom:7752 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/21/2022                Interval Top: 6830 ft.    Interval Bottom: 7107 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/17/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/2010
Treatment Summary:NBRR Perf 6830-6954 Holes 60 Size 0.42 CODL Perf 7087-7107 Holes 70 Size 0.38 Frac NBRR w/ 252 gal 15% HCl & 167,664 gal Vistar Hybrid & 250,160# 20/40 sand & 4,200# 20/40 sand.
Tubing Size:2.375 in.Tubing Setting Depth:7061 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/19/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 31
BTU_GAS 1231
CALC_BBLS_OIL 31
CALC_GOR 4290
CALC_MCF_GAS 133
CASING_PRESS 941
GRAVITY_OIL 51
MCF_GAS 133
TUBING_PRESS 427
Perforation Data:
Interval Top:6830 ft.# Of Holes:130
Interval Bottom:7107 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 10/16/2012                Interval Top: 6830 ft.    Interval Bottom: 6954 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/17/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/16/2012Treatment End Date:N/A
Treatment Summary:NB PERF 6830-6954 SHOTS 60 SIZE .40 5/8/2012 - Cleared out sand plug over JS to commingle well
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6830 ft.# Of Holes:60
Interval Bottom:6954 ft.Hole Size:0.4 in.

Formation DK-J                     Formation Classification:  GW                     Status:  CM - 4/27/1999

 Completed Information for Formation DAKOTA-JSND
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTA-JSNDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/1981
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DK-J.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation DKJCD                   Formation Classification:  GW                   Status:  CM - 4/27/1999

 Completed Information for Formation DAKOTA-J-CODELL
1st Production Date:N/AChoke Size:0.406 in.
Formation Name:DAKOTA-J-CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/1981
Treatment Summary:COMMINGLED DKJCD
Tubing Size:2.375 in.Tubing Setting Depth:7581 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/21/2003Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 46000
CALC_MCF_GAS 92
CASING_PRESS 24
GRAVITY_OIL 60
MCF_GAS 92
TUBING_PRESS 2
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No