Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10056
Well Classification: OW Status: PA - 10/24/2025
Well Name/No:IONE #13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/24/2025
FacilityID:242265LocationID:318830
County:WELD #123Location:SESE 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5053 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1320FSL  1320 FELLat/Long: 40.163477 / -104.740009Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.163696 / -104.739404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2013
End Date: 5/19/2013
Reported: 7/17/2013
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/24/2025             Measured TD: 8094 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/24/2025
Wellbore Permit
Permit #:19801218 Expiration Date:9/4/1981
Proposed Depth/Form:
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:6/13/1981
Spud Date:10/21/1980Spud Date Is:ACTUAL
Measured TD:8094 ft.Measured PB depth:8048 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:
Log Types:CBL, FDL, IES
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 223 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 229 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8094 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 7080 ft., Bottom: 8094 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: 0 ft., Depth: 7055 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6340 ft., Bottom: 7055 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: 0 ft., Depth: 950 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 888 ft., Bottom: 980 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 829 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 829 ft., Bottom: 829 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4508 ft.NN
NIOBRARA7214 ft.
CODELL7481 ft.
BENTONITE7900 ft.NN
J SAND7988 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/24/2025                Interval Top: 7938 ft.    Interval Bottom: 8000 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/1993
Treatment Summary:PUMPED 20,000 GAL SUPER K & 162,000 GAL POLARIS GEL & 832,000 20/40 MESH SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 68
BBLS_OIL 13
CASING_PRESS 480
GRAVITY_OIL 489
TUBING_PRESS 290
Perforation Data:
Interval Top:7938 ft.# Of Holes:30
Interval Bottom:8000 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/1/2025                  Interval Top: 7481 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/19/2013Treatment End Date:5/19/2013
Treatment Summary:1993 - perf 7484- 7499 with 60 shots; 2008 - perf 7481 - 7500 with 76 shots
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/28/1993
Treatment Summary:290,720# 20/40 SAND, 12,000# FRAC SAND IN 93,072 GALS GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 26
BBLS_OIL 18
CALC_GOR 7222
GRAVITY_OIL 130
TUBING_PRESS 175
Perforation Data:
Interval Top:7481 ft.# Of Holes:136
Interval Bottom:7500 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/13/2013                 Interval Top: 7260 ft.    Interval Bottom: 8000 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/5/2013Treatment End Date:N/A
Treatment Summary:Released RBP. Landed tubing @ 7246.5'. Commingled the J-Sand, Codell and Niobrara and returned to production on 7/26/2013.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/28/1993
Treatment Summary:JSND-NBRR-CDL COMMINGLE RELEASED RBP @ 7360'. 05-21-08. RELEASED RBP @ 7570' TO COMMINGLE THE JSND-NBRR-CDL. 05-22-08
Tubing Size:2.375 in.Tubing Setting Depth:7246 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/5/2013Test Method:FLOW
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 56
BTU_GAS 1422
CALC_BBLS_H2O 12
CALC_BBLS_OIL 56
CALC_GOR 2500
CALC_MCF_GAS 140
CASING_PRESS 318
GRAVITY_OIL 53
MCF_GAS 140
TUBING_PRESS 474
Perforation Data:
Interval Top:7260 ft.# Of Holes:138
Interval Bottom:8000 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/24/2025                Interval Top: 7260 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/19/2013Treatment End Date:5/19/2023
Treatment Summary:Did not reperf in 2013.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/28/1993
Treatment Summary:NBRR-CDL RE-FRAC & RECOMPLETION SET RBP @ 7570'. 04-03-08. RE-FRAC'D THE CODELL WITH 105,798 GAL FRAC FLUID AND 253,460# SAND. 05-05-08. SET RBP @ 7360'. 05-08-08. FRAC'D THE NIOBRARA WITH 158,044 GAL FRAC FLUID AND 254,540# SAND. 05-13-08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7260 ft.# Of Holes:168
Interval Bottom:7500 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/1/2025                  Interval Top: 7260 ft.    Interval Bottom: 7276 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7260 ft.# Of Holes:32
Interval Bottom:7276 ft.Hole Size:

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 1/16/2012

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7919 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation J-CDL.
No Perforation Data was found for formation J-CDL.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No