Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10002
Well Classification: GW Status: SI - 10/1/2022
Well Name/No:DARLENNE #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2022
FacilityID:242211LocationID:318815
Municipality/County:FORT LUPTON / WELD #123Location:NWSE 34 2N66W 6
Field:WATTENBERG - #90750Elevation:5051 ft.
Planned Location:1650FSL  1650 FELLat/Long: 40.091848 / -104.759679Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.091801 / -104.759681Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2011
End Date: 6/15/2011
Reported: 2/21/2012
Prior to rule 205A.b.(2)(A)
Days to report: 251
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2022             Measured TD: 8100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2022
Wellbore Permit
Permit #:19800910 Expiration Date:5/29/1997
Prop Depth/Form:8100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: J-CDL , Formation: J-CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:12/28/1980
Spud Date:7/29/1980Spud Date Is:ACTUAL
Measured TD:8100 ft.Measured PB depth:8055 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:IES & FDC CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 213 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8100 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 8100 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 990 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 290 ft., Bottom: 996 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE968 ft.
SUSSEX4583 ft.
NIOBRARA7189 ft.
CODELL7501 ft.
J SAND7944 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2022                 Interval Top: 7952 ft.    Interval Bottom: 7985 ft.

 Completed Information for Formation J SAND
1st Production Date:12/28/1980Choke Size:0.437 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/28/1980
Treatment Summary:750 GAL 7-1/2" MCA, 25000# 100 MESH 396000# 20/40 SS IN 160000 GAL W/45T CO2.
Tubing Size:2.875 in.Tubing Setting Depth:
Tubing Packer Depth:6769 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/1981Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 1
CALC_BBLS_H2O 22
CALC_BBLS_OIL 1
CALC_GOR 381000
CALC_MCF_GAS 381
CASING_PRESS 130
GRAVITY_OIL 51
MCF_GAS 381
Perforation Data:
Interval Top:7952 ft.# Of Holes:15
Interval Bottom:7985 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  SI - 10/1/2022                 Interval Top: 7506 ft.    Interval Bottom: 7520 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/15/2011
Treatment Summary:Refrac Codell, 7506-7520’ with 116,424 gals frac fluid containing 250,800# sand CIBP set @ 7570. Drilled out on 6/27/11.
Formation Treatment
Treatment Date:7/13/1996
Treatment Summary:FRAC'D W/110000 GALS SATURN III W/10000# 100 MESH & 392000# 20/40 SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 170
CALC_BBLS_H2O 20
CALC_BBLS_OIL 170
CALC_GOR 1747
CALC_MCF_GAS 297
MCF_GAS 297
TUBING_PRESS 975
Perforation Data:
Interval Top:7506 ft.# Of Holes:28
Interval Bottom:7520 ft.Hole Size:3.125 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 3/29/2012                 Interval Top: 7506 ft.    Interval Bottom: 7985 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2011
Treatment Summary:A CIBP was set @ 7570 on 6/3/11 to frac the Codell. It was drilled out on 6/27/11 and returned to production. The J Sand and Codell are commingled.
Formation Treatment
Treatment Date:12/7/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7954 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/11/2011Test Method:Flow
Hours Tested:7Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 3
BTU_GAS 1
CALC_BBLS_H2O 3
CALC_BBLS_OIL 10
CALC_GOR 1400
CALC_MCF_GAS 14
CASING_PRESS 473
GRAVITY_OIL 46
MCF_GAS 4
TUBING_PRESS 468
Perforation Data:
Interval Top:7506 ft.# Of Holes:43
Interval Bottom:7985 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
09/30/2022
Low ProducingYProduction Period
06/2023 - 05/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No