|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/26/2018 Measured TD: 7926 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/26/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 20052583 | Expiration Date: | 8/10/2006 | | Proposed Depth/Form: | 7226 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 607 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 425, Top: 0 ft., Bottom: 607 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7768 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 7096 ft., Bottom: 7768 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 850 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 850 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/24/1997 | | Spud Date: | 5/19/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7926 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | INDUCTION SFL & FORM DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 607 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7768 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7076 ft., Bottom: 7768 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7066 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6528 ft., Bottom: 7066 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 850 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 844 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 7926 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: , Bottom: , Determination Method: | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 1400 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 1340 ft., Bottom: 1400 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6974 ft. | | | | | FORT HAYS | 7195 ft. | | | | | CARLILE | 7234 ft. | | | | | GREENHORN | 7277 ft. | | | | | BENTONITE | 7505 ft. | | | | | D SAND | 7616 ft. | | | | | J SAND | 7676 ft. | | | | | DAKOTA | 7871 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 4/26/2018 Interval Top: 7836 ft. Interval Bottom: 7926 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/1997 | | Treatment Summary: | DAKOTA UNDER RBPP @7495'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 67 | | CALC_GOR | 19731 | | GRAVITY_OIL | 66 | | MCF_GAS | 1322 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7836 ft. | # Of Holes: | | | Interval Bottom: | 7926 ft. | Hole Size: | |
|
Formation DK-J Formation Classification: GW Status: CM - 2/26/1999 Interval Top: 7678 ft. Interval Bottom: 7719 ft.| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 11/26/1997 | Choke Size: | 0.453 in. | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/1997 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 78 | | CALC_GOR | 17385 | | GRAVITY_OIL | 66 | | MCF_GAS | 1356 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7678 ft. | # Of Holes: | 15 | | Interval Bottom: | 7719 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 4/26/2018 Interval Top: 7678 ft. Interval Bottom: 7719 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/1997 | | Treatment Summary: | J SAND UNDER RBP @7495'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | MCF_GAS | 34 | | TUBING_PRESS | 261 |
| | Perforation Data: | | Interval Top: | 7678 ft. | # Of Holes: | 15 | | Interval Bottom: | 7719 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 4/26/2018 Interval Top: 7221 ft. Interval Bottom: 7232 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/12/2006 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/11/2006 | | Treatment Summary: | FRAC CODELL Q/127,092 GALS OF VISTAR WITH 22# GEL LOADING AND 271,080/3'S IF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/25/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 28 | | CALC_GOR | 6857 | | CASING_PRESS | 250 | | MCF_GAS | 192 |
| | Perforation Data: | | Interval Top: | 7221 ft. | # Of Holes: | 44 | | Interval Bottom: | 7232 ft. | Hole Size: | 0.42 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 3/9/2008 Interval Top: 7221 ft. Interval Bottom: 7926 ft.| Completed Information for Formation DAKOTA-J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.516 in. | | Formation Name: | DAKOTA-J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/1997 | | Treatment Summary: | REMOVE RBP @ 7496' TO COMMINGLE JSND-DAKOTA-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7654 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/9/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 3 | | BTU_GAS | 1211 | | CALC_GOR | 20000 | | CASING_PRESS | 350 | | GRAVITY_OIL | 46 | | MCF_GAS | 60 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7221 ft. | # Of Holes: | 59 | | Interval Bottom: | 7926 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/26/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|