Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09930
Well Classification: GW Status: PA - 3/2/2016
Well Name/No:HARKIS POOLING UNIT #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/2/2016
FacilityID:242139LocationID:336089
County:WELD #123Location:SESE 12 2N65W 6
Field:WATTENBERG - #90750Elevation:4889 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FELLat/Long: 40.148288 / -104.606454Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.148290 / -104.606510Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/2/2016             Measured TD: 7750 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/2/2016
Wellbore Permit
Permit #:19800345 Expiration Date:7/31/1980
Proposed Depth/Form:7750 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/22/1980
Spud Date:4/20/1980Spud Date Is:ACTUAL
Measured TD:7750 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 612 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 612 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7742 ft., Weight: 10.5/11 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6510 ft., Bottom: 7742 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 4.5 in., Top: , Depth: 7101 ft., Weight: , Citings Type: COGCC
Cement:Sacks: 185, Top: 6510 ft., Bottom: 7101 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4500 ft.
NIOBRARA6830 ft.
CODELL7118 ft.
J SAND7570 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/2/2016                  Interval Top: 7580 ft.    Interval Bottom: 7624 ft.

 Completed Information for Formation J SAND
1st Production Date:7/2/1980Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/22/1980
Treatment Summary:POLARIS FRAC X 17,934 GAL OF COND 160,440 GAL OF WATER - 832,000# 20/40 SN
Tubing Size:2.375 in.Tubing Setting Depth:7750 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/1980Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 5
CALC_GOR 100000
GRAVITY_OIL 56
MCF_GAS 500
Perforation Data:
Interval Top:7580 ft.# Of Holes:
Interval Bottom:7624 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 3/2/2016                  Interval Top: 7120 ft.    Interval Bottom: 7136 ft.

 Completed Information for Formation CODELL
1st Production Date:4/26/1995Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/22/1980
Treatment Summary:DIVERTAFRAC: PUMPED 71 BBLS OF POLYMER GEL AND 215 BBLS OF POLYMER GEL WITH 4,500 LBS OF 20/40 SAND. FLUSHED WITH 105 BBLS OF POLYMER GEL. CODELL FRAC: PUMPED 429 BBLS OF POLYMER GEL AND 854 BBLS OF POLYMER GEL WITH 176,000 LBS OF 20/40 SAND. FLUSHED WITH 33 BBLS OF 2% KCL. PPA: 8.0, MAX PSI: 6600, MAX RATE: 16.8.
Tubing Size:2.375 in.Tubing Setting Depth:7128 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 2
CALC_GOR 5000
CASING_PRESS 930
MCF_GAS 10
TUBING_PRESS 12
Perforation Data:
Interval Top:7120 ft.# Of Holes:64
Interval Bottom:7136 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/2/2016                  Interval Top: 7120 ft.    Interval Bottom: 7624 ft.

 Completed Information for Formation J-CODELL
1st Production Date:5/19/1995Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/19/1995Test Method:FLOWING
Hours Tested:96Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 36
CALC_BBLS_H2O 1
CALC_BBLS_OIL 9
CALC_GOR 5667
CALC_MCF_GAS 51
MCF_GAS 204
Perforation Data:
Interval Top:7120 ft.# Of Holes:
Interval Bottom:7624 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/02/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No