|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/4/2013 Measured TD: 7774 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/4/2013 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/30/2012 | | Proposed Depth/Form: | 7774 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 50 ft., Bottom: 540 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7774 ft., Weight: 10.5/11.6, Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6900 ft., Bottom: 7774 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/1980 | | Spud Date: | 2/4/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7774 ft. | Measured PB depth: | 7726 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | (3/11/2010) CBL, (3/16/2010) CBL. | | Log Types: | SP-IES, FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 540 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7732 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6900 ft., Bottom: 7732 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6870 ft., Depth: 6860 ft., Bottom: 6750 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 600 ft., Depth: 762 ft., Bottom: 762 ft., Sacks: 460, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4360 ft. | | | | | SHANNON | 4490 ft. | | | | | NIOBRARA | 6870 ft. | | | | | J SAND | 7628 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/4/2013 Interval Top: 7634 ft. Interval Bottom: 7668 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/23/1980 | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/5/1980 | | Treatment Summary: | PERF 500 GAL 7.5% BDA FRAC DOWN CSG W/180,000 GAL X-LINKED GELLED FLUID 832,000# SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7690 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/5/1980 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 3 | | CALC_GOR | 450000 | | GRAVITY_OIL | 56.6 | | MCF_GAS | 1350 | | TUBING_PRESS | 225 |
| | Perforation Data: | | Interval Top: | 7634 ft. | # Of Holes: | | | Interval Bottom: | 7668 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/04/2013 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|