|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/23/2019 Measured TD: 8115 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/23/2019 | Wellbore Permit | DRIFTED | Permit #: | 19791322 | Expiration Date: | 11/26/1980 | Proposed Depth/Form: | 8115 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/23/1996 | Spud Date: | 2/6/1980 | Spud Date Is: | ACTUAL | Measured TD: | 8115 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | IES, GR/DL, CBL | Log Types: | IES, GR-DENSITY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 518 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 0 ft., Bottom: 518 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8115 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 6030 ft., Bottom: 8115 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5250 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 4990 ft., Bottom: 5254 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4300 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 4086 ft., Bottom: 4306 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4578 ft. | | N | N | SHANNON | 4972 ft. | | N | N | NIOBRARA | 7262 ft. | | N | N | CODELL | 7560 ft. | | N | N | J SAND | 7958 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/23/2019 Interval Top: 7960 ft. Interval Bottom: 8004 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/9/1980 | Choke Size: | 0.156 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/23/1996 | Treatment Summary: | 480 B WF60, 4,191B YF400, 45,000# 100 MESH, 69,000# 20-40 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7890 ft. | Tubing Packer Depth: | 7860 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/8/1980 | Test Method: | FLOWING | Hours Tested: | 15 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
CALC_MCF_GAS | 1500 | CASING_PRESS | 1580 |
| Perforation Data: | Interval Top: | 7960 ft. | # Of Holes: | 26 | Interval Bottom: | 8004 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 4/23/2019 Interval Top: 7560 ft. Interval Bottom: 7572 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/23/1996 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/23/1996 | Treatment Summary: | 241,000# 20-40 SAND, 65,520 GALS WTR W/ CLAYTREAT |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/31/1996 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 23 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 23 | CALC_GOR | 2826 | CALC_MCF_GAS | 65 | CASING_PRESS | 0 | MCF_GAS | 65 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7560 ft. | # Of Holes: | 13 | Interval Bottom: | 7572 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/23/1997 Interval Top: 7560 ft. Interval Bottom: 8004 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 11/15/1996 | Choke Size: | 0.343 in. | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7936 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/27/1996 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 30 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 30 | CALC_GOR | 11500 | CALC_MCF_GAS | 345 | CASING_PRESS | 580 | MCF_GAS | 345 | TUBING_PRESS | 320 |
| Perforation Data: | Interval Top: | 7560 ft. | # Of Holes: | 39 | Interval Bottom: | 8004 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/23/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|