|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/14/2022 Measured TD: 8048 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/14/2022 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 9/22/2010 | | Proposed Depth/Form: | 8048 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 210 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 804 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8048 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 510, Top: 5650 ft., Bottom: 8048 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/20/1976 | | Spud Date: | 7/12/1976 | Spud Date Is: | ACTUAL | | Measured TD: | 8048 ft. | Measured PB depth: | 8005 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | SP-IES & FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 240 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7360 ft., Bottom: 8037 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 6692 ft., Bottom: 7260 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 4350 ft., Bottom: 4780 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 754 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 25, Top: 4300 ft., Bottom: 4340 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6692 ft., Depth: 6690 ft., Bottom: 7260 ft., Sacks: 185, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4350 ft., Depth: 4300 ft., Bottom: 4780 ft., Sacks: 170, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 900 ft., Depth: 795 ft., Bottom: 1500 ft., Sacks: 240, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4300 ft., Depth: 4300 ft., Bottom: 4340 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 775 ft., Depth: 795 ft., Bottom: 785 ft., Sacks: 50, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 700 ft. | | N | N | | J SAND | 7870 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/14/2022 Interval Top: 7898 ft. Interval Bottom: 7930 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/5/1976 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/15/1976 | | Treatment Summary: | 82,900# 100 MESH SAND 344,400# 20/40 SN 216,300# 10/20 SD |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7790 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/15/1976 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 13 | | GRAVITY_OIL | 59.6 | | MCF_GAS | 1050 |
| | Perforation Data: | | Interval Top: | 7898 ft. | # Of Holes: | | | Interval Bottom: | 7930 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/14/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|