Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-08786
Well Classification: OW Status: PA - 2/14/2022
Well Name/No:WILLIAM DEASON GAS UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/14/2022
FacilityID:240998LocationID:318259
Municipality/County:FORT LUPTON / WELD #123Location:NWSE 6 1N66W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1380FSL  2160 FELLat/Long: 40.076842 / -104.818117Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.076840 / -104.818120Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/14/2022             Measured TD: 8048 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/14/2022
Wellbore PermitDRIFTED
Permit #:Expiration Date:9/22/2010
Proposed Depth/Form:8048 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2SE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 210 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 804 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8048 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 510, Top: 5650 ft., Bottom: 8048 ft.

Wellbore Completed
Completion Date:7/20/1976
Spud Date:7/12/1976Spud Date Is:ACTUAL
Measured TD:8048 ft.Measured PB depth:8005 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:SP-IES & FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 240 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7360 ft., Bottom: 8037 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 6692 ft., Bottom: 7260 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 4350 ft., Bottom: 4780 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 754 ft., Determination Method: CBL
Casing:String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8037 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 4300 ft., Bottom: 4340 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 6692 ft., Depth: 6690 ft., Bottom: 7260 ft., Sacks: 185, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4350 ft., Depth: 4300 ft., Bottom: 4780 ft., Sacks: 170, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 900 ft., Depth: 795 ft., Bottom: 1500 ft., Sacks: 240, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4300 ft., Depth: 4300 ft., Bottom: 4340 ft., Sacks: 25, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 775 ft., Depth: 795 ft., Bottom: 785 ft., Sacks: 50, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE700 ft.NN
J SAND7870 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/14/2022                 Interval Top: 7898 ft.    Interval Bottom: 7930 ft.

 Completed Information for Formation J SAND
1st Production Date:8/5/1976Choke Size:0.000 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:10/15/1976
Treatment Summary:82,900# 100 MESH SAND 344,400# 20/40 SN 216,300# 10/20 SD
Tubing Size:2.875 in.Tubing Setting Depth:7790 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/1976Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 13
GRAVITY_OIL 59.6
MCF_GAS 1050
Perforation Data:
Interval Top:7898 ft.# Of Holes:
Interval Bottom:7930 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/14/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No