Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-08495
Well Classification: GW Status: PA - 7/9/2019
Well Name/No:UPRR 22 PAN AM 'P' #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/9/2019
FacilityID:240707LocationID:318146
County:WELD #123Location:SWSW 35 3N66W 6
Field:WATTENBERG - #90750Elevation:5014 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1250FSL  990 FWLLat/Long: 40.177871 / -104.750145Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.177881 / -104.750332Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/9/2019             Measured TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/9/2019
Wellbore PermitDRIFTED
Permit #:19750697 Expiration Date:8/26/1997
Proposed Depth/Form:7890 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: S2SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:8/4/1975Spud Date Is:ACTUAL
Measured TD:7962 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 28 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 211 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7887 ft., Weight: 15.5/17 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6816 ft., Bottom: 7887 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6800 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 6490 ft., Bottom: 6800 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 717 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 210 ft., Bottom: 717 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: , Depth: 7962 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE705 ft.NN
J SAND7894 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/9/2019                  Interval Top: 7887 ft.    Interval Bottom: 7962 ft.

 Completed Information for Formation J SAND
1st Production Date:6/11/2010Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/25/2010
Treatment Summary:DRILL OUT CIBP TO COMMINGLE JSND W/ NB-CD
Formation Treatment
Treatment Date:6/19/1997
Treatment Summary:290,430 GALS; 79,800# 100 MESH SAND; 403,200# 20-40 SAND; 59,600# 10-20 SAND. 6/97: CM'D W/ CODL
Tubing Size:2.375 in.Tubing Setting Depth:7855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2010Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 1
BTU_GAS 1290
CALC_BBLS_H2O 18
CALC_BBLS_OIL 1
CALC_GOR 10000
CALC_MCF_GAS 10
CASING_PRESS 800
GRAVITY_OIL 51
MCF_GAS 10
TUBING_PRESS 800
Perforation Data:
Interval Top:7887 ft.# Of Holes:0
Interval Bottom:7962 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/1/2010                  Interval Top: 7450 ft.    Interval Bottom: 7462 ft.

 Completed Information for Formation CODELL
1st Production Date:11/6/1996Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/26/2010
Treatment Summary:NO ADDITIONAL TREATMENT.
Formation Treatment
Treatment Date:6/19/1997
Treatment Summary:CIBP PLACED @7380' W/2 SX SAND & 2 SX CMT ON TOP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP-SAND-CMT TO COMMINGLE WELL WITHIN THE NEXT 6 MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 165
BBLS_OIL 50
CALC_BBLS_H2O 165
CALC_BBLS_OIL 50
CALC_GOR 2380
CALC_MCF_GAS 119
MCF_GAS 119
Perforation Data:
Interval Top:7450 ft.# Of Holes:48
Interval Bottom:7462 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 6/19/1997                 Interval Top: 7450 ft.    Interval Bottom: 7962 ft.

 Completed Information for Formation J-CODELL
1st Production Date:6/19/1997Choke Size: 
Formation Name:J-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7895 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/19/1997Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 13
CALC_BBLS_H2O 6
CALC_BBLS_OIL 13
CALC_GOR 2154
CALC_MCF_GAS 28
MCF_GAS 28
Perforation Data:
Interval Top:7450 ft.# Of Holes:48
Interval Bottom:7962 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/9/2019                  Interval Top: 7228 ft.    Interval Bottom: 7462 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/11/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/26/2010
Treatment Summary:NBRR PERF 7228-7320 HOLES 60 SIZE 0.38. CODL PERF 7450-7462 HOLES 48 SIZE 0.38.
Tubing Size:2.375 in.Tubing Setting Depth:7855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1290
CALC_BBLS_OIL 1
CALC_GOR 10000
CALC_MCF_GAS 10
CASING_PRESS 800
GRAVITY_OIL 51
MCF_GAS 10
TUBING_PRESS 800
Perforation Data:
Interval Top:7228 ft.# Of Holes:108
Interval Bottom:7462 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/1/2010                  Interval Top: 7228 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/28/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/26/2010
Treatment Summary:NO ADDITIONAL TREATMENT.
Formation Treatment
Treatment Date:9/2/2009
Treatment Summary:70,032 GAL SW & 96,151 GAL SUPER Z LPH W/251,000# 20/40 & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BTU_GAS 1276
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 41000
CALC_MCF_GAS 82
CASING_PRESS 685
GRAVITY_OIL 50
TUBING_PRESS 63
Perforation Data:
Interval Top:7228 ft.# Of Holes:60
Interval Bottom:7320 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/09/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No